My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-DELIBERATE/ACT ON RES APPROVING CHANGE ORDERS NO 2 AND 3 TO CONTRACT WITH BOBBY SMALLWOOD CONSTRUCTION CO
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.11.12
>
10-DELIBERATE/ACT ON RES APPROVING CHANGE ORDERS NO 2 AND 3 TO CONTRACT WITH BOBBY SMALLWOOD CONSTRUCTION CO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 4:02:27 PM
Creation date
6/8/2012 4:02:27 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1~03 <br />Texas Department of Rural Affairs <br />Construction Contract Change Order Approval Request <br />Owner (concraccor Looaiay): <br />City of Paris <br />P.O. Box 9037 <br />Contract For (projecc aesoription): <br />RE-BID Downtown Sidewalk <br />Repiacement - Ciarksville St. <br />Date: May 7, 2012 <br />Project No.: TCF #710222 <br />Paris, TX 75461 <br />Phone #:903-785-7511 <br />Contractor. <br />Bobby Smallwood Construction <br />1795 NE 17th <br />Paris, TX 75460 <br />Engineer: <br />Hayter Engineering, Inc. <br />4445 SE Loop 286 <br />Paris, TX 75460 <br />TxCDBG Contract No. <br />TCF #710222 <br />Change Order No.: Two <br />(2) <br />Agreement Date: 3112/12 <br />Phone 903-727-2350 <br />Phone 903-785-0303 <br />En ineer's Pro'ect No.: 180050 <br />You are hereb re uested to com I with the followin chan es from the contract lans and s eci <br />Item Description of Changes-Quantities, Units, Unit Prices, Cont aet Price <br />No. Chan e in Com letion Scheduled, Etc. <br />fications: <br />Contract Price <br />See attached <br />Chan e in Contract Price <br />Chan e in Contract Time <br />Ori inal Contract Price: <br />$237,006.62 <br />Ori inal Contract Time: 105 da s <br />Previous Change Order(s) <br />No. 1 to No. 1 <br />Contract Price Prior to <br />this Chan e Order <br />Net Decrease of <br />this Chan e Order <br />Contract Price With all <br />A roved Chan e Orders <br />$17,47925 <br />$219,527.37 <br />$407.99 <br />$219,119.38 <br />Net Change From Previous <br />Chan e Orders 0 da s <br />Contract Time Prior to <br />this Chan e Order 105 da s <br />Net Increase/Decrease of <br />this Chan e Order 7 da s <br />Contract Time With all <br />A roved Chan e Orders 112 da s <br />Cumulative % Chan e in Contract Price: 7.54% <br />Com letion Date: Jul 30, 2012 <br />-1 : ..~:_..a a„ ~1 1,,, rhn nfFirc <br />TxCDBG reimbursement of costs approvea oy mis cnange oluC~ lz suu~s%0< orr~•~~, <br />RE OM EN E ~ <br />By: ~ <br />ENGINEER (Au4l~rized,Signature) <br />, <br />Date: S"1'«- <br />APPROVED: <br />By: <br />OWNER (Authorized Signature) <br />Date: <br /> <br />EXHIBIT~., <br />ACCEPTED: <br />By: <br />CONTRACTOR (Authorized <br />Signature) <br />Date: <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.