Laserfiche WebLink
Sliop Drawirtgs-All drawings, diagrams, illustrations, <br />schedules and other data which are specificaily prepared by <br />or foc CONTRACTOR to illustrate some portion oCthe Work <br />and all illustrations, brochures, standard schcdutes, perfor- <br />mance charts, instructions, diagrams and other information <br />prepared by a Supplier and submitted by CONTRACTOR to <br />illustrate material or equipment for some portion of the Work. <br />Specrf~cations-Those portions of the Contract Documents <br />cortsisting of written technical descriptions of materials, <br />equipment, construction systems, standards and workman- <br />ship as applied to the Work and ceRain administrative details <br />applicable thereto. <br />Subconrractar-An individual, firm or corporation having a <br />direct contract with CONTRACTOR or with any other Sub- <br />contractor for the performance of a part of the Nork at the <br />site. <br />Substantial Compleriori-The Work (or a specified part thereof) <br />has progressed to the point where, in the opinion of ENGI- <br />NEER as evidenced by ENGINEER's definitive certificate <br />of Substantial Completion, it is sufficiently complete, in <br />accordance with the Contract Documents, so that the Work <br />(or specified part) can be utilized for the purposes for which <br />it is intended; or if there be no such certificate issued, when <br />final paymerâ–ºt is due in accordance with paragraph 14.13. The <br />tenns "substantially complete" and "substantially com- <br />pleted" as applied to any Work refer to Substantial Comple- <br />tion theroof. <br />Suppfemenrary Conditions The part of the Contract Docu- <br />ments which amends or supplements these General Condi- <br />tions. <br />Supplier-A manufacturer, fabricator, supplier, distributor, <br />materialman or vendor. <br />Underground Facilities-All pipelines, conduits, ducts; cables, <br />wires, manholes, vaults, tanks, tunnels or other such facilities <br />or attachments, and any encasements containing such facil- <br />ities which have been installed underground to furnish any of <br />the following scrviccs or materials: electricity, gases, steam, <br />liquid petrolcum products, telephone or other communica- <br />tions, cable television, sewage and drainage removat, traffic <br />or other control systems or water. <br />Unit Price Work-Work to be paid for on the basis of unit <br />prices. <br />Work-The entire completed construction or the various sep- <br />arately identifiable parts thereof required to be furnished <br />under the Contract Documents. Work is the result of per- <br />focming secvices, furnishing labor and furnishing and incor- <br />porating matecials and equipmcnt into the construction, all <br />as rcquired by the Contract Documents. <br />Work Directive Change-A written directive to CON'fRAC- <br />TOR, issued on or afcec the EtCective Date of the Agreement <br />and signed by OWNER and recommended by ENGINEER, <br />orderinc an addition, dciction or rcvision in the Work, or <br />responding to diCtering or unforeseen physical conditions under <br />which the Work is to bc performed as provided in para,r,raph <br />4.2 or 4.3 or to emergencies under pacagraph 6.22. A Work <br />Directivc Change may not change the Contract Price or the <br />Contract Time, but is evidence that the parties expect that <br />the change directed or documented by a Work Directive <br />Change will be incorporated in a subsequently issued Change <br />Order fotlowing negotiations by the parties as to its effect, if <br />any, on the Contract Price or Contract Time as provided in <br />paragraph 10.2. <br />Writteit Amersdtr:ent-A written amendment of the Contract <br />Documents, signed by OWNER and CONTRACTOR on or <br />after the Effective Date of the Agreement and normally deal- <br />ing with the nonengineecing or nontechnical rather than strictly <br />Work-re(ated aspects of the Contract Documents. <br />ARTICLE 2-PRELIMINARY MATTERS <br />Delivery of Bortds: <br />2,1. When CONTRACTOR delivers the executed Agree- <br />ments to OWNER, CONTRACTOR shatl also deliver to <br />OWNER such Bonds as CONTRACTOR may be required to <br />furnish in accordance with paragraph 5.1. <br />Copies of Doeumentr. <br />2.2. OWNER shall furnish to CONTRACTOR up to ten <br />copies (unless otherwise specified in the Supplementary Con- <br />ditions) of the Contract Documents as are reasonably nec- <br />essary for the execution of the Nork. Additional copies wili <br />be furnished, upon request, at the cost of reproduction. <br />* Comrrceacerrient ojContract Time; Nolice 1o Proceed: <br />23. The Contract Time will commence to run on the <br />thirtieth day after the Effective Date of the Agreement, or, if <br />a Notice to Proceed is given, on the day indicated in the <br />1Iotice to Proceed. A Notice to Proceed may be given at any <br />time within thiccy days after the Effective Date of the Agree- <br />ment. In no event will the Contract Time commence to run <br />later than the seventy-fifth day after the day of Bid opening <br />or the thiRieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />Starting the Projecl: <br />2.4. CONTRACT'OR shall start to perfocm che Wark on <br />the date when the Contract Time commences to run, but no <br />Work shall be done at the site prior to the date on which the <br />Contract Time commences to run. <br />l3ejore Slartirtg Construclion: <br />2,5. Before undertaking each part of the Work. CON- <br />TRACTOR shall carefully study and compare the Contract <br />Documents and check and verify pertinent figures shown <br />*See Supplementary Conditions 36 <br />