My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. 1 <br />l <br />V <br />4.2.4. EA'G!n'EER's Rcrigtiti•: ENGINEER will <br />promptly review thc pertinent conditions, determine thc <br />necessity of obtaining additional cxplorations or tests with <br />respect thereto and advise OWN ER in wciting (with a copy <br />to CONTRACTOR) of ENGINEER's findings and con- <br />clusions. <br />4.2.5. Possible Docrrment Cltarige: If ENGINEER <br />concludes that there is a material error in the Contract <br />Documents or that because of newly discovered condi- <br />tions a change in the Contract Documents is required, a <br />Work Directive Change or a Change Order will be issued <br />as provided in Article 10 to reflect and document the <br />consequences of the inaccuracy or difference. <br />4.2.6. Possible Price at:d Time Adjustments: In each <br />such case, an increase or decrease in the Contract Price <br />or an extension or shoRening of the Contrac[ Time, or any <br />combination thereof, wiil be allowable to the extent that <br />they are attributable to any such inaccuracy or difference. <br />If OWNER and CONTRACTOR are unable to agree as to <br />the amount or length thereof, a claim may be made therefor <br />as provided in Articles 11 and 12. <br />Physical Conditions-Urtderground Facilities: <br />4.3.1. S/town or Indicated: The information and data <br />shown or indicated in the Conuact Documents with respect <br />to existing Underground Facilities at or contiguous to the <br />site is based on information and datafurnished to OWNER <br />or ENGINEER by the owners of such Underground Facil- <br />ities or by others. Unless it is otherwise expressly pro- <br />vided in the Supplementary Conditions: <br />4.3.1.1. OWNER and ENGINEER shall not be <br />responsib(e for the accuracy or completeness of any <br />such information or data; and, <br />43.1.2. CONTRACTOR shall have fu(1 responsi- <br />bility for reviewing and checking all such infocmation <br />and data, for locating all Underground Facitities shown <br />or indicated in the Contract Documents; for coordina- <br />tion of the Work with the owners of such Underground <br />Facitities during construction, for the safety and pro- <br />tection thereof as provided in paragraph 6.20 and <br />repairing any damage thereto resu(ting from the Work, <br />the cost of all of which will be considered as having <br />been included in the Contract Price. <br />4.3.2. Not Shown or Indicated. If an Underground <br />Facility is uncovered or revea(ed at or contiguous to the <br />site which was not shown or indicated in the Contract <br />Documents and which CONTRACTOR could not reason- <br />ably have been expected to be aware of, CONTRACTOR <br />shall, prompt(y after becoming aware thereof and before <br />performing any Work aft'ected thereby (except in an emer- <br />gency as permitted by paragraph 6.22), identify the owner <br />of such Underground Facility and give written notice thereof <br />to that owner and to OWNER and ENGINEER. ENGI- <br />NEER will promptly review the Underground Facility to <br />dctcrminc thc cxtcnt to which the Contract Documents <br />should be modified to reflect and document the conse- <br />quences of the existence of the Underground Facility, and <br />thc Contract Documents will be amended or supplemented <br />to the extent necessary. During such time, CONTRAC- <br />TOR shall be responsible for the safety and protection of <br />such Underground Facility as provided in paragraph 6.20. <br />CONTRACTOR shall be atlowed an increase in the Con- <br />tract Price or an extension of the Contcact Time, or both, <br />to the extent that they are attributable to the eristence of <br />any Underground Facility that was not shown or iadicated <br />in the Contract Documents and which CONTRACTOR <br />could not reasonably have been expected to be aware of. <br />If the parties are unable to agree as to the amount or length <br />thereof, CONTRACTOR may make a claim therefor as <br />provided in Articles 1 l..and 12. <br />Rejerence Poinls: <br />4.4. OWNER shall provide engineering surveys to estab- <br />lish reference points for construction which in ENGINEER's <br />judgment are necessary to enable CONTRACTOR to proceed <br />with the Work. CONTRACTOR shall be responsible for lay- <br />ing out the Work (unless otherwise specified in the General <br />Requirements), shall protect and preserve the established <br />reference points and shall make no changes or retocations <br />without the prior written approval of OWNER. CONTRAC- <br />TOR shall report to ENGINEER whenever any reference <br />point is lost or destroyed or requires relocation because of <br />necessary changes in grades or loca[ions, and shall be respon- <br />sible for the accurate replacement or relocation of such ref- <br />erence points by professionally quatified personnel. <br />ARTICLE 5-BONDS AND INSURANCE <br />Performance and Other Bonds: <br />5.1. CONTRACTOR shall furnish performance and pay- <br />ment Bonds, each in an amount at least equal to the Contract <br />Price as security for the faithful performance and payment of <br />al( CONTRACTOR's obligations under the Contract Docu- <br />ments. These Bonds shalt remain in effect at least until one <br />year after the date when finat payment becomes due, except <br />as othenvise provided by Law or Regulation or by the Con- <br />tract Documents. CONTRACTOR shall also furnish such <br />other Bonds as are required by the Supplementary Condi- <br />tions. All Bonds shall be in the forms prescribed by Law or <br />Regulation or by the Contract Documents and be executed <br />by such sureties as are named in the current list of "Com- <br />panies Holding Certificates of Authority as Acceptable Sure- <br />ties on Federal Bonds and as Acceptable Reinsuring Com- <br />panies" as published in Circular 570 (amended) by the Audit <br />Staff Bureau of Accounts, U.S. Treasury Department. Alt <br />Bonds signed by an agent must be accompanied by a cectified <br />copy of the authority to act. <br />5.2. If the surety on any Bond furnished by CONTRAC- <br />TOR is declared a bankrupt or becomes insolvent or its right <br />to do business is terminated in any state where any part of <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.