My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner <br />or Engineer. <br />6. Bid Securitv. <br />6.1 Each Bid must be accompanied by Bid security made payable to Owner in an amount of five <br />percent of the Bidder's maximum price and in the form of a certified or bank check or a Bid Bond <br />(on form attached, if a form is prescribed) issued by a surety meeting the requirements of Paragraph <br />5.1 of the General Conditions. <br />6.2 The Bid security of the Successful Bidder will be retained until such Bidder has executed the <br />Agreement and furnished the required contract security, whereupon the Bid security will be returned. <br />If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract <br />security within fifteen days after the Notice of Award, Owner may annul the Notice of Award and <br />the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner <br />believes to have a reasonable chance of receiving the award may be retained by Owner until the <br />earlier of the seventh day after the Effective Date of the Agreement or the sixty-first day after the Bid <br />opening, whereupon Bid security furnished by such Bidders will be returned. Bid security with Bids <br />which are not competitive will be returned within seven days after the Bid opening. <br />7. Contract Time. <br />The number of days within which, or the dates by which, the Work is to be substantially completed <br />and also completed and ready for final payment (the Contract Time) are set forth in the Bid Form <br />and the Agreement. <br />8. Liquidated Damag-es. <br />Provisions for liquidated damages, if any, are set forth in the Agreement. <br />9. Substitute or "Or-Equal" Items. <br />The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings <br />or specifications without consideration of possible substitute or "or-equal" items. <br />Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or- <br />equal" item of material or equipment may be furnished or used by Contractor if acceptable to <br />Engineer, application for such acceptance will not be considered by Engineer until after the Effective <br />Date of the Agreement. The procedure for submission of any such application by Contractor and <br />consideration by Engineer is set forth in Paragraphs 6.7.1, 6.7.2 and 6.7.3 of the General Conditions <br />and may be supplemented in the Technical Specifications. <br />10. Subcontractors Suppliers and Others. <br />10.1 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers and <br />other persons and organizations (including those who are to furnish the principal items of material <br />and equipment) to be submitted to Owner in advance of the specified date prior to the Effective Date <br />of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.