My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC 1 DEFINED TERM.S <br />The ternas used in these Supplementary Conditions which are <br />defined in the Standard General Conditions of the <br />Construction Contract have the meanings assigned to them <br />in the General Conditions. <br />SC 2.3 <br />Amend the last sentence of paragraph 2.3 of the General <br />Conditions to read as follows: <br />"In no event will the Contract Time commence to run later than <br />the eighty-fifth day (85th) after the day of Bid opening <br />or the thirtieth day (30th) after the Effective Date of <br />the Agreement, whichever date is earlier." <br />and as so amended paragraph 2.3 remains in effect. <br />SC 3.2 <br />Add the following language at the end of paragraph 3.2 of the <br />General Conditions: <br />"Should there be any conflict between the provisions of the <br />Contract Documents and any such referenced provisions of <br />any standard specification, manual or code, the Contract Documents will take precedence. <br />SC 4.2.1 <br />Add the following language at the end of paragraph 4.2.1 of <br />the General Conditions: <br />"No subsurface reports of exploration and tests of subsurface <br />conditions at the site have been utilized by the ENGINEER <br />in preparation of the Contract Documents." <br />SC 5.1 <br />Add the following language at the end of paragraph 5.1 of the . <br />General Conditions: <br />"The form for Construction Performance Bond and Construction <br />Payment Bond are set forth herein." <br />SC 5.3 <br />The Limits of liability for the insurance required by <br />paragraph 5.3 of the General Conditions shall provide <br />coverage for not less than the following amounts or <br />grater where required by Laws and Regulations: 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.