Laserfiche WebLink
SC 1 DEFINED TERM.S <br />The ternas used in these Supplementary Conditions which are <br />defined in the Standard General Conditions of the <br />Construction Contract have the meanings assigned to them <br />in the General Conditions. <br />SC 2.3 <br />Amend the last sentence of paragraph 2.3 of the General <br />Conditions to read as follows: <br />"In no event will the Contract Time commence to run later than <br />the eighty-fifth day (85th) after the day of Bid opening <br />or the thirtieth day (30th) after the Effective Date of <br />the Agreement, whichever date is earlier." <br />and as so amended paragraph 2.3 remains in effect. <br />SC 3.2 <br />Add the following language at the end of paragraph 3.2 of the <br />General Conditions: <br />"Should there be any conflict between the provisions of the <br />Contract Documents and any such referenced provisions of <br />any standard specification, manual or code, the Contract Documents will take precedence. <br />SC 4.2.1 <br />Add the following language at the end of paragraph 4.2.1 of <br />the General Conditions: <br />"No subsurface reports of exploration and tests of subsurface <br />conditions at the site have been utilized by the ENGINEER <br />in preparation of the Contract Documents." <br />SC 5.1 <br />Add the following language at the end of paragraph 5.1 of the . <br />General Conditions: <br />"The form for Construction Performance Bond and Construction <br />Payment Bond are set forth herein." <br />SC 5.3 <br />The Limits of liability for the insurance required by <br />paragraph 5.3 of the General Conditions shall provide <br />coverage for not less than the following amounts or <br />grater where required by Laws and Regulations: 61 <br />