Laserfiche WebLink
SC 5.7 <br />Delete paragraph 5.7 of the General Conditions in its entirety <br />and insert the following in its place: <br />"Neither the CONTRACTOR nor the OWNER is required to purchase <br />and maintain boiler and machinery insurance for this project." <br />SC 6.3 <br />Amend the first sentence of paragraph 6.3 of the General <br />Conditions to read as follows: <br />"The OWNER shall provide competent, suitably qualified <br />personnel to survey and layout the Work by providing such <br />alignment and grade stakes as may reasonably be required. <br />The CONTRACTOR shall provide competent, suitably <br />qualified personnel to perform construction as required <br />by the Contract Documents." <br />Add the following sentence at the end of paragraph 6.3 to read <br />as follows: <br />"The CONTRACTOR shall reimburse the OWNER for any overtime <br />compensation required to be made to inspectors due to <br />CONTRACTOR's working hours before or after 8 a.m. to 5 p.m. <br />SC 6.9 <br />Add the following language at the end of paragraph 6.9 of the <br />General Conditions: <br />"If requested, the OWNER or ENGINEER may furnish to any such <br />Subcontractor, Supplier or other person or organization, <br />to the extent practicable, evidence of amount paid to <br />CONTRACTOR in accordance with CONTRACTOR's Applications <br />for Payment." <br />SC 6.13 <br />Add the following language at the end of paragraph 6.13 of the , <br />General Conditions: <br />"The OWNER will obtain any permits required from the Texas <br />Department of Highways and Public Transportation." <br />SC 6.15 <br />Add the following language to the end of paragraph 6.15 of the <br />General Conditions: <br />63 <br />