My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D StreetScape Proposals
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
07 - July
>
July 09, 2001
>
05-D StreetScape Proposals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:12 AM
Creation date
7/6/2001 1:38:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
PROPOSALS
Description
StreetScape Project
AGENDA - Date
7/9/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITEXAS <br />Project Profile <br /> <br />Hotel Gibraltar <br />Rehabilitation <br />Paris, Texas <br /> <br />Client <br />St. Joseph's Hospital <br /> <br />ARCHITEXAS provided historic preservation planning services for the preparation of a master plan for the <br />adaptive use of a 1915 hotel located in the downtown commercial district of Paris, Texas which is listed on <br />the National Register of Historic Places. The contributing historic structure has a three story 1926 addition, <br />the Annex, which housed the Red Ball Bus Station. The structures have been vacant since 1977 and significant <br />deterioration has occurred. <br /> <br />The property was acquired by the local St. Joseph's Hospital with the goal to adapt the buildings to a senior <br />activity center, restore the hotel lobby and partner the development of the seven story tower with private <br />developer for housing. The master plan achieved the objectives of the hospital by creating a phased strategy <br />that included rehabilitation of the Annex for the senior citizen's center and exterior restoration as Phase I. <br /> <br />The rehabilitation will comply with the Secretary of the Interior's Standards for Rehabilitation to allow the <br />private partner in the Project to utilize the Investment Tax Credit. <br /> <br />The project budget for Phase I is $3,985,000 and furore phases totaling $5,885,000. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.