Laserfiche WebLink
Fungal-Biological Hazard Remediation Protocol-Phase II <br />Grand Theater ■ 21 Lamar Street, Paris, Texas <br />February 24, 2011 ■ Terracon Project No. 94117645 <br />10.0 REMOVAL OF BUILDING MATERIALS <br />Irerracon <br />The building materials that will be removed and disposed following PRD remediation are <br />identified in Table 1.0. <br />TABLE 1.0, REMOVAL OF BUILDING MATERIALS <br />LOCATION'': . <br />BUILDING MATERIAL <br />` : HAZARD . <br />QUANTITY <br />2"d Floor Lobby <br />Ceiling tiles, floor, walls, <br />Fungal Growth/PRD <br />82 ftz/NA <br />Restrooms <br />contents <br />2"a Floor Lobby <br />Floors, walls, contents <br />PRD <br />NA <br />Auditorium <br />Floors, walls, contents <br />PRD <br />NA <br />The PRD and general contaminated debris will be placed in double bags and discarded as <br />construction debris. <br />The materials to be disposed as construction debris will be placed in double bags and the bags <br />decontaminated prior to removal from the contained work areas. <br />11.0 PROJECT MODIFICATION <br />The MAC, on an individual basis, will consider modifications designed to expedite or <br />enhance the fungal remediation procedure. The MAC must approve deviations from the <br />fungal-biological hazard remediation procedure described. <br />12.0 POST REMEDIATION VERIFICATION CRITERIA <br />The project will be cleared by, 1) visual inspection, and 2) total bioaerosol analysis. <br />The post remedial visual inspection and sample collection will be conducted while <br />containments/critical barriers are in place and properly depressurized. The <br />containment(s) may not be removed or completely depressurized until final clearance <br />has been achieved and written, interim notice provided by the MAC to the MRC. <br />ii. The visual inspection criteria will consist of an evaluation of the remediation area to <br />determine if the remediation has been properly conducted in accordance with the <br />project specifications, applicable state regulations and the fungal growth, defined <br />biological-hazards, and extraneous debris within the work areas has been properly <br />removed. <br />Responsive ■ 12esourceful ■ Reliable 5 <br />MAC # 0107/11-10-12 <br />