My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fungal-Biological Hazard Remediation Protocol-Phase II <br />Grand Theater ■ 21 Lamar Street, Paris, Texas <br />February 24, 2011 ■ Terracon Project No. 94117645 <br />Irerracon <br />■ Specifications for Accident Prevention Signs and Tags: Title 29, Part 1910, <br />Section 145 of the Code of Federal Regulations. <br />14.2 Texas Department of State Health Services (TDSHS): Texas Mold Assessment and <br />Remediation Rules, 2004 (TMARR). <br />15.0 PROJECT SUBMITTALS <br />Prior to start of work, as a minimum, one copy of the following is to be provided to Terracon by <br />the MRC: <br />■ TDSHS 5-Day (or emergency) notification. <br />■ Contractor's TDSHS license (corporate and supervisor). <br />■ Worker documentation, including evidence that all workers have received proper <br />training and are accredited and registered as required by regulations; respiratory fit <br />test for each worker who is to be at the jobsite. <br />■ Material Safety Data Sheets (MSDS) to be utilized on this project. <br />■ Mold Remediation Work Plan <br />At the conclusion of the remedial project the MRC will submit the following: <br />■ A Certificate of Mold Remediation Damage in accordance with TDSHS regulations <br />contained in the TMARR (25 TAC §295.301-295.338). <br />16.0 MITIGATION OF MOISTURE <br />The building owner is responsible for the mitigation of moisture intrusion and the required <br />remedial actions should be provided to the MAC. <br />➢ Roof repairs must be verified to ensure that moisture intrusion due to roof leaks has been <br />mitigated. <br />Responsive ■ Resocarceful ■ Reliable <br />7 <br />MAC # 0107/11-10-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.