My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 ■ Terracon Project No. 94107645 <br />CONTRACTOR RESPONSIBILITIES: <br />Illegible submittals will be rejected and returned for re-submittal. <br />Schedule submittals according to general flow of Work and so as to allow for adequate <br />and timely review of submittals by CONSULTANT. <br />Review submittals prior to submission and submit to CONSULTANT in accordance with <br />provisions herein. <br />Verify field measurements, construction criteria, catalog numbers and similar data. <br />Coordinate submittals with requirements of Work and Contract Documents. <br />CONTRACTOR'S responsibility for errors or omissions is not relieved by <br />CONSULTANT's review. <br />CONTRACTOR'S responsibility for deviations from requirements of Contract Documents <br />is not relieved by CONSULTANT'S review, unless CONSULTANT is notified of <br />deviations in writing at time of submittal, and gives written review of specific deviations. <br />Do not begin work which requires submittals until reviewed submittals have been <br />reviewed and approved by CONSULTANT. <br />If required, reproduce and distribute copies after CONSULTANT'S review. <br />CONSULTANT'S RESPONSIBILITIES: <br />Review submittals within five working days or indicate in writing reasons for reviews <br />which require additional time. <br />Review for conformance with design concept of project and information given in Contract <br />Documents. <br />Indicate results of review and return submittals to CONTRACTOR for distribution. <br />CONSULTANT is not responsible for verification of field measurements, construction <br />criteria, catalog numbers and other similar data. <br />Review of separate items does not constitute review of an assembly in which items <br />function. <br />Ftesponsive ■ Resourceful■ Re9'sable 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.