Laserfiche WebLink
Phase II - Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre ■ 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 ■ Terracon Project No. 94107645 <br />Post-abatement or removal to determine if previously specified clearance criteria has <br />been met in each area of remediation. The clearance level has been established at 40 <br />micrograms per square foot (µg/ft2) on horizontal surfaces. The specific location and <br />number of samples will be determined upon conclusion of the remediation. If at any time <br />the post-abatement or removal wipe samples exceed the clearance levels identified. The <br />Contractor shall be responsible additional cleaning of the area to attempt to achieve <br />clearance levels. If additional cleaning is required, the Contractor will perform the re- <br />cleaning with no adjustment in the contract price. <br />PERSONAL MONITORING: <br />The CONTRACTOR shall perform air monitoring as required to meet OSHA <br />requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br />fiber counts for types of respiratory protection provided. The OWNER will not be <br />providing air monitoring services to meet these OSHA requirements. Note: Results of <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the <br />time samples are obtained. A listing of all personal monitoring results obtained during <br />the project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />Responsive ■ Resourceful■ Reliable 16 <br />