Laserfiche WebLink
7. Restroom Facilities <br /> <br />Presently, there are public restroom facilities only at two parks. The City rents portable toilets during the <br />summer months which costs $8,000 to $10,000 per year. Permanent vandal resistant restrooms should be built <br />that meet accessibility standards for the handicapped. They should be lockable, well lighted and of course well <br />maintained. Vandal resistant lighting is also a must. Because they are so susceptible to vandalism, restrooms <br />should be built in high use parks such as Culbertson, Oak, and Record. Generally, these are the parks where <br />reservations are made for large groups and restrooms could be unlocked. The smaller neighborhood parks may <br />not need these facilities. <br /> <br />Estimated Cost .......................................................................................... $50,000 - $70,000 per park <br /> <br />8. Land Acquisition <br /> <br />As the city expands, it will need to add parks and recreation land through dedication or purchase. In particular, <br />areas which should be looked at include east of Loop 286 and west of 286 near the U.S. Highway 82 corridor. <br />Inside the Loop, the City should begin dialoge with Paris 1SD regarding a possible neighborhood park on the <br />comer of the Crockett Middle School Campus since this area is not within the service area of an existing <br />neighborhood park. <br /> <br />Estimated Cost ..................................................................................................................... $30,000 <br /> <br />NOTE: Costs are preliminary estimates only and prepared without the benefit of detailed engineering data. <br /> All costs shown are based on 2001 dollars. Final construction costs will vary. <br /> <br /> <br />