My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-L HMAC Street Overlay Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
07 - July
>
July 09, 2001
>
08-L HMAC Street Overlay Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:21 AM
Creation date
7/6/2001 5:12:57 PM
Metadata
Fields
Template:
AGENDA
Item Number
8-L
AGENDA - Type
RESOLUTION
Description
HMAC Street Overlay - Award Bid
AGENDA - Date
7/9/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATIONS <br /> <br />2001 CITY STREET HMAC OVERLAY PROGRAM <br /> PROJECT NO. 46.53 <br /> <br />CONTRACTOR shall furnish insurance certificate indicating insurance coverage in the <br />types and amounts shown in ITEM 7 paragraph 7.4 Insurance, in the Texas Department <br />of Transportation STANDARD SPECIFICATIONS FOR CONSTRUCTION OF HIGHWAYS <br /> <br />STREETS AND BRIDGES latest Edition (TxDOT specifications). <br /> <br />Within 15 days after written notification of award of the contract the bidder shall execute <br />and furnish to the City the contract, with (1) a performance bond and a payment bond, with <br />powers of attorneys attached, each in the full amount of the contract price, executed by a <br />surety company or surety companies authorized to execute surety bonds under and in <br />accordance with the laws of the State of Texas, and (2) the Certificate of Insurance <br />showing coverages in accordance with contract requirements. <br /> <br />The performance bond and payment bond are to be furnished as a guarantee of <br />the faithful performance of the work and for the protection of the claimants for labor and <br />materials. <br /> <br />No partial payments for work in place will be made. One payment, upon successful <br />completion and acceptance by the OWNER will be made. <br /> <br />Quantities shown on the BID FORM are estimated quantities only. The OWNER will direct <br />the work working with the CONTRACTOR, to expedite and minimize any downtime and <br />moving time. Payments to the CONTRACTOR will be made based on mutually agreed to <br />amount of time that equipment is used or the ticketed tonnage of materials as bid. <br /> <br />CITY'S RESPONSIBILITIES <br /> <br />The City will be responsible for and/or make additional payment to the <br />CONTRACTOR for: <br /> <br />a. Fuel used by milling machine. <br /> <br />b. Replacement teeth and holders for milling machine, as needed, for this project. <br /> <br />c. Any water required by milling machine and compactors. <br /> <br />Traffic control, including personnel, barricades, signs, detours or any other devices <br />or people needed to accomplish traffic control. <br /> <br />Clean-up behind milling operations including power operated street sweepers, <br />brooms, detail pavement removal, handwork, etc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.