Laserfiche WebLink
Notice of Award <br />Date: March 12, 2012 <br />Project: RE-BID Downtown Sidewalk Replacement - Clarksville Street <br />Owner: City of Paris Owner's Contract No.: TCF #710222 <br />Contract: RE-BID Downtown Sidewalk Replacement - Clarksville St. Engineer's Project No.: 180050 <br />Bidder: Bobby Smallwood Construction Co., Inc. <br />Bidder's Address: <br />1795 NE 17°i <br />Paris, TX 75460 <br />You are notified that your Bid dated January 17, 2012 for the above Contract has been considered. You are <br />the Successful Bidder and are awarded a Contract for RE-BID Downtown Sidewalk Replacement - Clarksville <br />Street <br />The Contract Price of your Contract is Two Hundred Thirty Seven Thousand Six Dollars and Sixty Two <br />Cents ($237 006 62) Base Bid plus Additive Alternate. <br />4 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award. <br />4 sets of the Drawings will be delivered separately at the Preconstruction Conference to be scheduled after <br />contract execution and approval. <br />You must comply with the following conditions precedent within 15 days of the date you receive this <br />Notice of Award. <br />1. Deliver to the Owner 4 fully executed counterparts of the Contract Documents. <br />2. Deliver with the executed Contract Documents 4 copies of Certificate of Insurance that complies <br />with the Contract Documents general conditions and supplemental conditions. <br />Failure to comply with these conditions within the time specified will entitle Owner to consider you in <br />default, annul this Notice of Award, and declare your Bid security forfeited. <br />Within ten days after you comply with the above conditions, Owner will return to you one fully executed <br />counterpart of the Contract Documents. <br />Copy to Engineer <br />Owner <br />By: <br />Authorized Signature <br />Mavor <br />Title <br />29 <br />EJCDC GSlO Notice of Award <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. <br />Page 1 of 2 <br />