My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-A-2&3 Airport Report
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
11-A-2&3 Airport Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:11:18 AM
Creation date
8/11/2001 1:00:55 PM
Metadata
Fields
Template:
AGENDA
Item Number
11-A-(2)&(3)
AGENDA - Type
CITY ATTORNEY REPORT
Description
Cox Field Airport
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIRPORT IMPROVEMENTS GRANTS <br />1. Project No. 9-41-149-5701 (Civil Aeronautics Administration) - Construction of new <br />terminal building. <br />Amount: $113,706.99 Total Cost; $56,505.86 Federal Funds; $57,201.13 Matching Funds <br />(1957) <br />2. Project No. A-48-0169-01 (US-FAA) - Develop Master Plan. <br />Amount: $5,653.00 Federal Funds <br />(1957) <br />3. Project No. 8-48-0169-02 (US-FAA) - Acquire land; extend runway 17-35 by 1,500 feet; <br />install medium intensity runway lights on extended runway 17-35; install rotating beacon, <br />segmented circle, and lighted wind cone; and perform pavement marking incidental to <br />construction. <br />Amount: $380,302.67 Total Cost; $285,227.00 Federal Funds; $41,075.67 State funds; <br />$54,000.00 Matching Funds <br />(1975) <br />4. TAC Project No. 741-4-25183 (also 751-5-26012) - Acquire south clear zone easements; <br />extend Runway 17/35 from 4,500' to 6,000; install lighting; construct T-hangar and taxi- <br />ways. <br />Amount: $50,000.00 State Funding <br />(1975) <br />5. Project No. 6-48-0169-03 (DOT); Contract No. DOT FA 76 SW-8001 - Phase One - <br />Overlay and mark old portion of Runway 17/35; and <br />Project No. 6-48-0169-04 (DOT); Contract No. DOT FA 77 SW-8182 - Phase Two - <br />Overlay and mark new extension of Runway 17/3 5; and construct T-hangar taxiway. <br />Amount: Phase One -$154,659.00 Federal Funding; Phase Two -$145,884.00 Federal <br />Funding <br />(1977) <br />6. TAC Project No. 785-14 - Pave multiple T-hangar apron. <br />Amount: $12,500.00 State Funding <br />(1978) <br />7. TAC Project No. 836-20 - Construct fuel storage and access ramp. <br />Amount: $115,000.00 State Funding <br />(1983) <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.