Laserfiche WebLink
235 <br /> <br />24 <br /> <br />24.1 <br /> <br />242 <br /> <br />243 <br /> <br />25 <br /> <br />2.5.1 <br /> <br />2.5.2 <br /> <br />2.5.2.1 <br /> <br />2.5.22 <br /> <br />2.52.3 <br /> <br />other related documents. <br />Furnish one copy of the above documents and of the Drawings and Specifications and <br />present and review them with OWNER. <br /> <br />Bidding <br /> <br />Assist OWNER in advertising for bids for a single prime contract for the Work. <br />Prepare addenda as appropriate to interpret, clarify or expand the Bidding Documents. <br />Attend the bid opening, prepare bid tabulation sheets, and recommend an award if deemed <br />appropriate. <br /> <br />Ccm~t~n mtinn Pha~e <br /> <br />ENGINEER shall consult, advise, and act as OWNER'S representative as provided in the <br />construction contract. All of OWNER'S instructions to CONTRACTOR will be issued through <br />ENGINEER who will have authority to act on behalf of OWNER to the extent provided in said <br />construction contract. <br /> <br />In connection with observations of the work of CONTRACTOR while it is in progress: <br /> <br />ENGINEER shall make visits to the site at intervals ENGINEER deems necessary., in order to <br />observe the progress and quality of the CONTRACTOR'S work. Based on information <br />obtained during such visits and on such observations, ENGINEER shall endeavor to determinc <br />in general, if such work is proceeding in accordance with the contract documents. <br /> <br />If requested by OWNER or recommended by ENGINEER and agreed to in writing by <br />OWNER, an on-site observer will be furnished, to act as directed by ENG1NEER in order to <br />assist ENGINEER in observing performance of the work. Such services will be paid tbr as per <br />Section 3b. The duties and responsibilities and the limitations on the authority of the on-site <br />observer will be set forth in a separate exhibit which is to be made a part of this Agreement <br />before such services begin. <br /> <br />ENGINEER'S visits to, and representation by the on-site observer at the site, will enable <br />ENGINEER to better carry out the duties and responsibilities assigned to ENGINEER during <br />the Construction Phase, and, by exercise of ENGINEER'S efforts as an experienced and <br />qualified design professional, provide OWNER a greater degree of confidence that the <br />completed work of CONTRACTOR will conform generally to the contract documents <br />ENGINEER shall not, however, during such visits or as a result of such observations, supervise, <br />direct or have control over CONTRACTOR'S work, nor shall ENGINEER have authority over <br />or responsibility for the means, methods, techniques, sequences or procedures or construction <br />selected by CONTRACTOR or for safety precautions and programs incident to the work, or fi)r <br /> <br />7 of 10 <br /> <br /> <br />