Laserfiche WebLink
h. Selection of contractor will be bid or fi.om a City established list will be made by Owner. <br /> Contractor will bid on specifications. ,If bid is within 15% of estimate, a contract will be <br /> drawn up between owner and contractor. If bid is greater than 15% above estimate <br /> contractor will have the opportunity to modifiy bid. If not, Owner will select another <br /> contractor fi.om the list. <br /> <br /> i. Completed application package is presented to Housing Board for approval. <br /> j. Construction contract and all closing documents are prepared and signed. <br /> k. Owner issues Notice To Proceed to contractor. <br /> <br /> 1. Interim inspections are made as necessary. <br /> <br /> m. Final inspection is made. <br /> <br /> n. Contractor provides owner with; 1 year warranty, releases fi.om all sub contractors and <br /> suppliers. <br /> <br /> o. City will provide payment to Contractor on behalf of Owner. <br /> <br /> p. Aid applicant in exercising a 1 year warranty made by the contractor when necessary. <br /> <br /> 4.3 Approval Of Loan Application <br /> <br /> If the rehabilitation/reconstruction amount is sufficient to repair the structure to local codes, the <br /> application shall be presented to the Housing Board. When signed it will be considered approved. <br /> <br /> 4.4 Loan Cancellation <br /> <br /> An approved rehabilitation loan may be canceled because the applicant has requested cancellation, <br /> or is unwilling or unable to proceed with the rehabilitation work. <br /> <br /> The City may cancel a rehabilitation loan if it is determined that information given is incorrect or <br /> incomplete. <br /> <br /> In either event the City will prepare a letter of cancellation and mail to owner. City will retain a <br /> copy. <br /> -9- <br /> <br /> <br />