royahy. All '.miatinnsofth¢ proposed substitute from Ihat OWN ER and ENGINEER and it' CON I'RACTOR has
<br />specilied ,.','ill bc identified in thc*~q*plication and uvaihd',le submitted a list thereof in accordance with the Supple-
<br />maimenanc¢, repel: and rcph~ccmcnt SCl-Vice will be indi- meat;try C',m,,litlons. OWNER's or ENGIN E UF"s accept-
<br />creed. The application ','.'ill also c,.mtain an itemized esti- tulce {eft hca' in '*','fling or by failing It'. make ,.v~itten obj¢c-
<br />mate of all costs that ,.,.'ill resu directly or nd racily from lion thereto by the date indicated for acceptance or objec-
<br />acceptance of such substitute, including costs of redesign lion in the bidding ducuments or the Contract Documents)
<br />and claims of other contractors affected by the resulting of any such Subcontractor. Supplier or other person or
<br />change, all of which shall be considered by ENGINEER organization so identified ma.'., be revoked on the basis of
<br />in evaluating the proposed substitute. ENGINEER may reasonable objection after due investigation, in which case
<br />require CONTRACTOR to furnish at CONTRACTOR's, CONTRACTORshallsubmitanacccpmblesubstitute,the
<br />expense additional data about Ihe proposed substitute. Contract Price will be increased by the difference in the
<br /> cost occasioned by such substitution and an appropriate
<br />6.'/.2. Ifa specific means, method, technique, sequence Change Order will be issued or Written Amendment signed.
<br />or procedu,'e of coast:action is indicated in or required by No acceptance by OWN ER or ENGINEER of any such
<br />the Contract Documents, CONTRACTOR may furnish or Subcontractor. Supplier or other person or organization
<br />utiliz<: a substitute means, method, sequence, technique shall constitute a waiver of any right of OWNER or ENGI-
<br />or procedure of construction acceptable to ENGINEER. NEER to reject defective Work.
<br />if CONTRACTOR submits sufficient information to allow
<br />ENGINEER to determine that the substitute proposed is · ~ 6.9. CONTRACTOR shall be fully responsible to OWNER
<br />equivalent to that indicated or required by Ihe Contract and ENGINEER for all acts and omissions of the Subcon-
<br />Documents. The procedur., for review by ENGINEER tractors. Suppliers and other persons and organizations per-
<br />wilt be similar to that 13rovided in paragraph 6.7.1 as applied forming or furnishing any of the Work under a direct or
<br />by ENGINEER and as may be supplemented in the Gun- indirect contract with CONTRACTOR just as CONTRAC-
<br />eraI Requirements. TOR is responsible for CONTRACTOR's own acts and omis-
<br /> sions. Nothing in the Contract Documents shall create any
<br />6.7.3. ENGINEER will be allowed a reasonable time contractual relationship between OWNER or ENGINEER
<br />within which to evaluate each proposed substitute. ENGI- and any such Subcontractor, Supplier or other person or
<br />NEER wilI be the sole judge of acceptability, and no organization, nor shall it create any obligation on the part of
<br />substitute wilI be ordered, installed or utilized without OWNER or ENGINEER to pay or lo see to the payment of
<br />ENGINEER's prior written acceptance which will be evi- any moneys due any such Subcontractor, Supplier or other
<br />dented by either a Change Order or an approved Shop person or organization except as may otherwise be required
<br />Drawing. OWNER may require CONTRACTOR to fur- by Laws and Regulations.
<br />nish at CONTRACTOR's expense a special performance
<br />guarantee or other surety wilh respect to any substitute. 6.10. The divisions and sections of Ibc Specifications and
<br />ENGINEER will record time required by ENGINEER the identifications of any Drawings shall not control CON-
<br />and ENGINEER's consultants in evaluating substitutions TRACTOR in dividing the Work among Subcontractors or
<br />proposed by CONTRACTOR and in making changes in Suppliers or delineating the Work to be performed by any
<br />the Contract Documenls occasioned thereby. Whether or specific trade.
<br />not ENGINEER accepts a proposed substitute, CON-
<br />TRACTOR *hall reimburse OWNER for the charges of 6.11. All Work performed for CONTRACTOR by a Sub-
<br />ENGINEER and ENGINEER's consultants for evaluat- contractor will be pursuant to an appropriate ag:cement
<br />ina each proposed substitute, between CONTRACTOR and the Subcontractor which spe-
<br /> cifically binds the Subcontractor to the applicable terms and
<br /> conditions of the Contract Documents for the benefit of
<br />Concerning Subcontractors, Suppliers and Others: OWNER and ENGINEER and contains waiver provisions
<br />6.8.1. CONTRACTOR shall not employ any Subeon- as required by paragraph 5.11. CONTRACTOR shall pay
<br />tractor, Supplierorotherpersonororganization(including each Subcontractor a just share of any insurafice moneys
<br />those acceptable to OWNER and ENGINEER as indl- received by CONTRACTOR on account olios*es under poi-
<br />cared in paragraph 6.8.2), whether initially or as a substi- icies issued pursuant to paragraphs 5.6 and 5.7.
<br />tutu, against whom OWNER or ENGINEER may have
<br />reasonable objection, CONTRACTOR shall not be required
<br />to employ any Subcontractor, Supplier or other person or Patent Fees and Royalties:
<br />organizatlonto fumishorperformanyoftheWorkagainst 6.12. CONTRACTOR shall pay all license fees and roy-
<br />whom CONTRACTOR has reasonable objection, aries and assume all costs incident to the use in thc peri'or-
<br />6.8.2. If Ibc Supplementary Conditions require the manta of the Work or the incorporation in the Work of any
<br />identity of certain Subcontractors, Suppliers or other per- invention, design, process, product or device which is the
<br />sons or organizations (including those who are to furnish subject of.patent rights or copyrights held by others. If a
<br />the principal items of materials and equipment) to be sub- particular invention, design, process, product or device is
<br />mltled to OWNER in advance of the specified date prior specified in thc Contract Documents for usc in thc pc:for-
<br />to the Effective Date ot' thc Ag:cement for acccptancc by manet of thc Work and if to thc actual knowledge of 0WNER
<br />
<br /> · See Supplementary Conditions 43
<br />
<br />
<br />
|