be responsible for and shall pay all,c~osts in connection with thru'eof, CONTRACTOR may n'take a claim flmref,:,r as pro- <br />any inspection or testing required in connection with OWN- vided in Articles ~ Iund 12. <br />ER's or ENGINEER's acceptance of a Supplier of materials <br />or equipment proposed to be incorporated in the Work, or of Owner May Stop the Work: <br />materials or equipment submitted for approval prior to CON- 13.10. If the Work is defective, or CONTRACTOR fails <br />TRACTOR's purchasethereoffor incorporationintheWork., to snpply sufficient skilled workers or snitable materials or <br />The cost of all inspections, tests and approvals in addition to equipment, or fails to furnish or perform the Work in such a <br />thc above which are required by thc Contract Documents way that the completed Work will conform to the Contract <br />shall be paid by OWN ER (unless other.vise specified). Documents, OWN ER may order CONTRACTOR to st, op the <br /> Work, or any portion thereof, until the cause for such order <br />13.5. All inspections, tests or approvals other than those has been eliminated; however, this right of OWNER to stop <br /> the Work shall not give rise to an), duty on the part of OWNER <br />required by Laws or Regulations of any public body having <br />jurisdiction shall be performed by organizations acceptable to exercise this right for the benefit of CONTRACTOR or <br />to OWNER and CONTRACTOR (or by ENGINEER if so any other party. <br />specified). <br /> <br /> Correction or Removal of Defective Work: <br /> 13.6. If any Work (including the work of others) that is <br /> to be inspected, tested or approvod is covered without written 13.11. I f required by ENGINEER, CONTRACTOR shall <br /> concurrence of ENGINEER. it must, if requested by ENGI- promptly, as directed, either correct all defective Work, <br /> NEER, be uncovered forobservation. Such uncovering shall whether or not fabricated, installed or completed, or. if the <br /> be at CONTRACTOR's expense unless CONTRACTOR has Work has been rejected by ENGINEER, remove it from the <br /> given ENGINEER timely notice of CONTRACTOR's inten- site and replace it with nondefective Work. CONTRACTOR <br /> tlon to cover the same and ENGINEER has not acted with shall bear all direct, indirect and consequential costs of such <br /> reasonable promptness in response to such notice, correction or removal (including but not limited to fees and <br /> charges of engineers, architects, attorneys and other profes- <br /> 13.7. Neither observations by ENGINEER nor iaspec- signals) made necessary thereby. <br /> tigris, tests or approvals by others shall relieve CONTRAC- <br /> TOR from CONTRACTOR's obligations to perform the Work One Year Correction Period: <br /> in accordance with the Contract Documents. <br /> 13.12. If within one year after the date of Substantial <br /> Completion or such longer period of time as may be pre- <br /> scribed by Laws or Regulations or by the terms of any appli- , <br /> Uncovering Work: cable special guarantee required by the Contact Documents <br /> or by any specific provision of the Contract Documents. any <br /> 13.8. Ifa.ny Work is covered contrary to the written request <br /> of ENGINEER. it must, if requested by ENGINEER, be Workisfoundtobedefecth,e. CONTRACTORshallpromptly, <br /> without cost to OWNER and in accordance with OWNER's <br /> uncovered for ENGINEER's observation and replaced at written instructions, either correct such defective Work, or, <br /> CONTRACTOR's expense, if it has been rejected by OWNER, remove it from the site <br /> and replace it with nondefective Work. If CONTRACTOR <br /> 13.9. If ENGINEER considers it necessary or advisable <br /> that covered Work be observed by ENGINEER or inspected docs not promptly comply with the terms of such instructions. <br /> or tested by others. CONTRACTOR, at ENGINEER's or in an emergency where delay would cause serious risk of <br /> request, shall uncover, expose or otherwise make available loss or damage. OWNER may have the defective Work cor- <br /> rected or the rejected Work removed and replaced, and all <br /> for observation, inspection or testing as ENGINEER may <br /> require, that portion of the Work in question, furnishing all direct, indirect and consequential costs of such removal and <br /> necessary labor, material and equipment. If it is found that replacement (including but not limited to fees an~ charges of <br /> engineers, architects, attorneys and other professionals) will, <br /> suchWorkisdefective. CONTRACTORsha .bear all direct , <br /> indirect and consequential costs of such uncovering, expo- be paid by CONTRACTOR. In special circumstances where <br /> sure. observation, inspection and testing and of satisfactory a particular item of equipment is placed in continuous service <br /> before Substantial Completion of all the Work. the correction <br /> reconstruction, (including but not limited to fees and charges <br /> of engineers, architects, attorneys and other professionals), period for that item may start to run from an earlier date if <br /> and OWNER shall be entitled to an appropriate decrease in so provided in the Specifications or by Written Amendment. <br /> the Contract Price, and. if the parties are unable to agree as <br /> to the amount thereof, may make a claim therefor as provided <br /> in Article II. if, however, such Work is not found to be Acceptance ofDefectiw Work: <br /> defective. CONTRACTOR shall be allowed an increase in 13.13. if. instead of requiring correction or removal and <br /> the Contract Price or an extension of the Contract Time, or replacement of defecth.e Work. OWNER (and. prior to <br /> both, directly attributable to such uncovering, exposure. ENGINEER's recommendation of final payment, also <br /> observation, inspection, testing and reconstruclion; and. il' ENGINEER)prefers toaccept it OWNERmaydosg. CON- <br /> the parties are unable to agree as to the amount or extent TRACTOR shall bear all direct, indirect and consequential <br /> <br /> 53 <br /> <br /> <br />