Laserfiche WebLink
SC 1 DEFINED TERM~ <br /> <br /> The terms used in these Supplementary Conditions which are <br /> defined in the Standard 'General Conditions of the <br /> Construction Contract have the meanings assigned to them <br /> in the General Conditions. <br /> <br /> SC 2.3 <br /> <br /> Amend the last sentence of paragraph 2.3 of the General <br /> Conditions to read as follows: <br /> <br /> "In no event will the Contract Time commence ~orun later than <br /> the eighty-fifth day (85th) after the day of Bid opening <br /> or the thirtieth day (30th) after the Effective Date of <br /> the Agreement, whichever date is earlier." <br /> <br /> and as so amended paragraph 2.3 remains in effect. <br /> <br />SC 3.2 <br /> <br /> Add the following language at the end of paragraph 3.2 of the <br /> General Conditions: <br /> <br /> "Should there be any conflict between the provisions of the <br /> Contract Documents and any such referenced provisions of <br /> any standard specification, manual or code, the Contract <br /> Documents will take precedence. <br /> <br />SC4.2.1 <br /> <br /> Add the following language at the end of paragraph 4.2.1 of <br /> the General Conditions: <br /> <br /> "No subsurface reports of exploration and tests of subsurface <br /> conditions at the site have been utilized by the ENGINEER <br /> in preparation of the Contract Documents." <br /> <br />SC 5.1 <br /> <br /> Add the following language at the end of paragraph 5.1 of the <br /> General Conditions: <br /> <br /> "The form for Construction Performance Bond and Construction <br /> Payment Bond are set forth herein." <br /> <br />SC 5.3 <br /> <br /> The Limits of liability for the insurance required by <br /> paragraph 5.3 of the General Conditions shall provide <br /> coverage for not less than the following amounts or <br /> grater where required by Laws and Regulations: <br /> <br /> <br />