My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC 1 DEFINED TERM~ <br /> <br /> The terms used in these Supplementary Conditions which are <br /> defined in the Standard 'General Conditions of the <br /> Construction Contract have the meanings assigned to them <br /> in the General Conditions. <br /> <br /> SC 2.3 <br /> <br /> Amend the last sentence of paragraph 2.3 of the General <br /> Conditions to read as follows: <br /> <br /> "In no event will the Contract Time commence ~orun later than <br /> the eighty-fifth day (85th) after the day of Bid opening <br /> or the thirtieth day (30th) after the Effective Date of <br /> the Agreement, whichever date is earlier." <br /> <br /> and as so amended paragraph 2.3 remains in effect. <br /> <br />SC 3.2 <br /> <br /> Add the following language at the end of paragraph 3.2 of the <br /> General Conditions: <br /> <br /> "Should there be any conflict between the provisions of the <br /> Contract Documents and any such referenced provisions of <br /> any standard specification, manual or code, the Contract <br /> Documents will take precedence. <br /> <br />SC4.2.1 <br /> <br /> Add the following language at the end of paragraph 4.2.1 of <br /> the General Conditions: <br /> <br /> "No subsurface reports of exploration and tests of subsurface <br /> conditions at the site have been utilized by the ENGINEER <br /> in preparation of the Contract Documents." <br /> <br />SC 5.1 <br /> <br /> Add the following language at the end of paragraph 5.1 of the <br /> General Conditions: <br /> <br /> "The form for Construction Performance Bond and Construction <br /> Payment Bond are set forth herein." <br /> <br />SC 5.3 <br /> <br /> The Limits of liability for the insurance required by <br /> paragraph 5.3 of the General Conditions shall provide <br /> coverage for not less than the following amounts or <br /> grater where required by Laws and Regulations: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.