Laserfiche WebLink
SC 5.7 <br /> <br /> Delete paragraph 5.7 of the General Conditions in its entirety <br /> and insert the following in'its place: <br /> <br /> "Neither the CONTRACTOR nor the OWNER is required to purchase <br /> and maintain boiler and machinery insurance for this project." <br /> <br /> SC 6.3 <br /> <br /> Amend the first sentence of paragraph 6.3 of the General <br /> Conditions to read as follows: <br /> <br /> "The OWNER shall provide competent, suitably qualified <br /> personnel to survey and layout the Work byproviding such <br /> alignment and grade stakes as may reasonably be required. <br /> The CONTRACTOR shall provide competent, suitably <br /> qualified personnel to perform construction as required <br /> by the Contract Documents." <br /> <br /> Add the following sentence at the end of paragraph 6.3 to read <br /> as follows~ <br /> <br /> "The CONTRACTOR shall reimburse the OWNER for any overtime <br /> compensation required to be made to inspectors due to <br /> CONTRACTOR's working hours before or after 8 a.m. to 5 p.m. <br /> <br /> SC 6.9 <br /> <br /> Add the following language at the end of paragraph 6.9 of the <br /> General Conditions: <br /> <br /> "If requested, the OWNER or ENGINEER may furnish to any such <br /> Subcontractor, Supplier or other person or organization, <br /> to the extent practicable, evidence of amount paid to <br /> CONTRACTOR in accordance with CONTRACTOR's Applications <br /> for Payment." <br /> <br />SC 6.13 <br /> <br /> Add the following language at the end of paragraph 6.13 of the <br /> General Cond±tions: <br /> <br /> "The OWNER will obtain any permits required from the Texas <br /> Department of Highways and Public Transportation." <br /> <br />SC 6.15 <br /> <br /> Add the following language to the end of paragraph 6.15 of the <br /> General Conditions: <br /> <br /> ~3 <br /> <br /> <br />