Laserfiche WebLink
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br /> <br />7.1 <br /> <br />CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br />Work, site locality, and all local conditions and Laws and Regulations that in any manner may <br />affect cost, progress, performance or furnishing of the Work. <br /> <br />7.2 <br /> <br />CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in paragraph 4.2 of the General Conditions, and accepts the <br />determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent <br />of the technical data contained in such reports and drawings upon which CONTRACTOR is <br />entitled to reply. <br /> <br />7.3 <br /> <br />CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and <br />studies (in additions to or to supplement those referred to in paragraph 7.2 above) which <br />pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of the Work at the Contract Price, within <br />the Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; <br />and no additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data are or will be required by CONTRACTOR for such purposes. <br /> <br />7.4 <br /> <br />CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing Underground Facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of said Underground Facilities. <br />No additional examinations, investigations, explorations tests, reports, studies or similar <br />information or data in respect of said Underground Facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of Contract Documents, <br />including specifically the provisions of paragraph 4.3 of the General Conditions. <br /> <br />7.5 <br /> <br />CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions f the <br />Contract Documents. <br /> <br />7.6 <br /> <br />CONTRACTOR has given ENG1NEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENG1NEER is acceptable to CONTRACTOR. <br /> <br />Article 8. CONTRACT DOCUMENTS. <br /> <br />2O <br /> <br /> <br />