My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br />representations: <br /> <br />7.1 <br /> <br />CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br />Work, site locality, and all local conditions and Laws and Regulations that in any manner may <br />affect cost, progress, performance or furnishing of the Work. <br /> <br />7.2 <br /> <br />CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary <br />Conditions as provided in paragraph 4.2 of the General Conditions, and accepts the <br />determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent <br />of the technical data contained in such reports and drawings upon which CONTRACTOR is <br />entitled to reply. <br /> <br />7.3 <br /> <br />CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and <br />studies (in additions to or to supplement those referred to in paragraph 7.2 above) which <br />pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br />affect the cost, progress, performance or furnishing of the Work at the Contract Price, within <br />the Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; <br />and no additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data are or will be required by CONTRACTOR for such purposes. <br /> <br />7.4 <br /> <br />CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing Underground Facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of said Underground Facilities. <br />No additional examinations, investigations, explorations tests, reports, studies or similar <br />information or data in respect of said Underground Facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of Contract Documents, <br />including specifically the provisions of paragraph 4.3 of the General Conditions. <br /> <br />7.5 <br /> <br />CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions f the <br />Contract Documents. <br /> <br />7.6 <br /> <br />CONTRACTOR has given ENG1NEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENG1NEER is acceptable to CONTRACTOR. <br /> <br />Article 8. CONTRACT DOCUMENTS. <br /> <br />2O <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.