My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Payment Requests: Review applications for payment with <br /> CONTRACTOR for compliance with the established procedure <br /> for their submission and forward with recommendations to <br /> ENGINEER, noting particularly the relationship of the <br /> payment requested to the schedule of values, Work <br /> completed and materials and equipment delivered at the <br /> site but not incorporated in the Work. <br /> <br /> 11. Certificates, Maintenance and Operation Manuals: During <br /> the course of the Work, verify that certificates, <br /> maintenance and operation manuals and other data required <br /> to be assembled and furnished by CONTRACTOR are <br /> applicable to the items actually in, tailed and in <br /> accordance with the Contract Documents, and have this <br /> material delivered to ENGINEER for review and forwarding <br /> to OWNER prior to final payment for the Work. <br /> <br /> 12. Completion~ <br /> <br /> a. Before ENGINEER issues a Certificate of Substantial <br /> Completion, submit to CONTRACTOR a list of observed <br /> items requiring completion or correction. <br /> <br /> b. Conduct final inspection in the company of ENGINEER, <br /> OWNER and CONTRACTOR and prepare a final list of <br /> items to be completed or corrected. <br /> <br /> c. Observe that all items on final list have been <br /> completed or corrected and make recommendation to <br /> ENGINEER concerning acceptance. <br /> <br />C. Limitations of Authority <br /> <br /> Resident Project Representative: <br /> <br /> 1. Shall not authorize any deviation from the Contract <br /> Documents or substitution of materials or equipment, <br /> unless authorized by ENGINEER. <br /> <br /> 2. Shall not exceed limitations of ENGINEER's authority ~ <br /> as set forth in the Contract Documents. <br /> <br /> 3. Shall not undertake any of the responsibilities of <br /> CONTRACTOR, subcontractors or CONTRACTOR's <br /> superintendent. <br /> <br /> 4. Shall not advise on, issue directions relative to or <br /> assume control over any aspect of the means, methods, <br /> techniques, sequences or procedures of construction <br /> unless such advice or directions are specifically <br /> required by the Contract Documents. <br /> <br /> 67 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.