Laserfiche WebLink
B. Lap-Seam Roof Panels: Fasten roof panels to purlins with exposed fasteners at each lapped <br /> joint at location and spacing determined by manufacturer. <br /> 1. Arrange and nest side-lap joints so prevailing winds blow over, not into, lapped joints. <br /> Lap ribbed or fluted sheets one full rib corrugation. Apply panels and associated items <br /> for neat and weathertight enclosure. Avoid "panel creep" or application not tree to line.. <br /> 2.Locate and space exposed fasteners in tree vertical and horizontal alignment. <br /> 3. Provide sealant tape at lapped joints of roof panels and between panels and protruding <br /> equipment, vents, and accessories. <br /> 4. Apply a continuous ribbon of sealant tape to weather-side surface of fastenings on end <br /> laps, and on side laps of nesting-type panels. <br /> 5. At panel splices, nest panels with minimum 6-inch (150-mm) end lap, sealed with butyl <br /> sealant and fastened together by interlocking clamping plates. <br /> <br />3.5 WALL PANEL INSTALLATION <br /> <br /> A. General: Provide panels full height of building when possible. Install panels perpendicular to <br /> girts. <br /> 1. Arrange and nest side-lap joints so prevailing winds blow over, not into, lapped joints. <br /> Install panels with vertical edges plumb. Lap ribbed or fluted sheets one full rib corruga- <br /> tion. Apply panels and associated items for neat and weathertight enclosure. Avoid <br /> "panel creep" or application not true to line. <br /> 2. Unless otherwise indicated, begin panel installation at corners with center of rib lined up <br /> with line of framing. <br /> 3. Field cutting by torch is not permitted. <br /> 4. Align bottom of wall panels and fasten with blind rivets, bolts, or self-tapping screws. <br /> 5. Fasten flashing and trim around openings and similar elements with self-tapping screws. <br /> 6. When two rows of panels are required, lap panels 4 inches (100 mm) minimum. Locate <br /> panel splices over structural supports. <br /> 7. When building height requires two rows of panels at gable ends, align lap of gable panels <br /> over wall panels at cave height. <br /> 8. Install screw fasteners with power tools having controlled torque adjusted to compress <br /> neoprene washer tightly without damage to washer, screw threads, or panels. Install <br /> screws in predrilled holes. <br /> 9. Provide weather-resistant escutcheons for pipe and conduit penetrating exterior walls. <br /> 10. Flash and seal wall panels with weather closures under eaves and rakes, along lower <br /> panel edges, and at perimeter of all openings. <br /> 11. Apply elastomeric sealant continuously between metal base channel (sill angle) and con- <br /> crete, and elsewhere as necessary for waterproofing. Handle and apply sealant and <br /> backup according to sealant manufacturers written instructions. <br /> 12. Use aluminum or stainless-steel fasteners for exterior applications and galvanized fasten- <br /> ers for interior applications. <br /> 13. Locate and space fastenings in true vertical and horizontal alignment. <br /> <br />3.6 DOOR INSTALLATION <br /> <br /> A. General: Comply with manufacturer's written instructions for installing doors, hardware, opera- <br /> tors, and other door components. Coordinate installation with wall flashings and other compo- <br /> nents. Seal perimeter of each door frame with elastomeric sealant used for panels. <br /> <br /> B. Personnel Doors and Frames: Install doors and frames straight, level, and plumb. Securely an- <br /> chor frames to building structure. Set units with maximum 1/8-inch (3-mm) clearance between <br /> door and frame at jambs and head and maximum 3/4-inch (19-mm) clearance between door and <br /> floor. <br /> <br />City of Paris, Texas 13125 - 11 T-Hangar Building <br /> <br /> <br />