My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-061 RES APPROVING CHANGE ORDERS NO TWO AND THREE TO CONTRACT BETWEEN BOBBY SMALLWOOD CONST CO AND COP IN AMOUNT OF $237,006.62 FOR CLARKSVILLE STREET DOWNTOWN SIDEWALK PROJECT
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-061 RES APPROVING CHANGE ORDERS NO TWO AND THREE TO CONTRACT BETWEEN BOBBY SMALLWOOD CONST CO AND COP IN AMOUNT OF $237,006.62 FOR CLARKSVILLE STREET DOWNTOWN SIDEWALK PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:55:30 AM
Creation date
7/17/2012 10:51:03 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~103 <br />Texas Department of Rural Affairs <br />Construction Contract Change Order Approval Request <br />Owner (concractor Locaiity): Contract For (projecc degcripcion): Date: May 7, 2012 <br />City of Paris RE-BID Downtown Sidewaik <br />P.O. Box 9037 Replacement - Clarksvilie St. Project No.: TCF #710222 <br />Paris, TX 75461 <br />Phone #:903-785-7511 TxCDBG Contract No. <br />Contractor. Engineer: <br />Loop 2gs ' Inc. TCF #710222 <br />Bobby Smallwood Construction 4~ Hayter <br />1795 NE 17'h Chan Order No.: Two <br />Paris, TX 75460 Paris, TX 75460 (2) 9e <br />Agreement Date: 3/12/12 Phone 903-785-0303 <br />Phone 903-727-2350 En ineer's Pro'ect No.: 180050 <br />You are hereb re uested to com I with the followin chan es from the contract lans and s ecifications: <br />ecrease in Increase in <br />Item Description of Changes-uuantities, Units, Unit Prices, D Contract Price Contract Price <br />No. Chan e in Com letion Scheduled, Etc. <br />See attached <br />Ori inal Contract Price: <br />$237,006.62 <br />Ori inal Contract Time: 105 da s <br />Previous Change Order(s) <br />Net Change From Previous <br />0 da : <br />1 to No. 1 <br />No <br />$17,479.25 <br />Chan e Orders <br />. <br />Contract Price Prior to <br />37 <br />527 <br />$219 <br />Contract Time Prior to <br />this Chan e Order 105 da s <br />this Chan e Order <br />. <br />, <br />Net Increase/Decrease of <br />Net Decrease of <br />this Chan e Order <br />$407.99 <br />7 da s <br />this Chan e Order <br />Contract Price With all <br />119 <br />38 <br />$219 <br />Contract Time With all <br />A roved Chan e Orders 112 da ! <br />Approved Change Orders <br />. <br />, <br />Cumulative % Chan e in Contract Price: 7.54% <br />Com letion Date: Jul 30, 2012 <br />TxCDBG reimbursement of costs approved by this c <br />hange order is subject to approval by the Office. <br />k <br />RE OM EN E <br />APPROVED: <br />ACCEPTED: <br />t <br />By: <br />By: <br />By: <br />! <br />ENGINEER (Aut~orized,Signature) <br />OWNER(Authorized Signature) <br />CONTRACTOR (Authorized <br />gignature) <br />. l <br />Date: <br />Date: S~~'~Z <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.