Laserfiche WebLink
1103 <br />Texas Department of Rural Affairs <br />Construction Contract Change Order Approval Request <br />Owner (concraaor Looaiicy): <br />Contract For (Proiecc description): <br />Date: June 1, 2012 <br />Ci#y of Paris <br />RE-BID Downtown Sidewalk <br />P.O. Box 9037 <br />Replacement - Clarksville St. <br />Project No.: TCF #710222 <br />Paris, TX 75461 <br />Phone #:903-785-7511 <br />Contractor: <br />Engineer: <br />TxCDBG Contract No. <br />Bobby Smallwood Construction <br />Hayter Engineenng, Inc. <br />TCF #710222 <br />1795 NE 17'h <br />4445 SE Loop 286 <br />Paris, TX 75460 <br />Paris, TX 75460 <br />Change Order No.: <br />Three (3) <br />Agreement Date: 3/12/12 Phone 903-785-0303 <br />Phone 903-727-2350 En ineer's Pro'ect No.: 180050 <br />You are hereb re uested to com I with the followin chan es from the contract lans and s ecifications: <br />Item Description of Changes-Quantities, Units, Unit Prices, Decrease in Increase in <br />No. Chan e in Com letion Scheduled> Etc. Contract Price Contract Price <br />C03-1 Remove and replace 272 square feet of structural $13,500.00 <br />sidewalk at the northwest corner of Clarksville Street and <br />1" SE. <br />20 Delete relocate existing water meter ($1,063.00) I 1 <br />TOTAL 1 $12,437.00 <br />Ori inal Contract Price: <br />$237 006.62 <br />Ori inal Contract Time: <br />105 <br />da s <br />Previous Change Order(s) <br />Net Change From Previous <br />No. 1 to No. 2 <br />$17,887.24 <br />Chan e Orders <br />7 <br />da s <br />Contract Price Prior to <br />Contract Time Prior to <br />this Chan e Order <br />$219,199.38 <br />this Chan e Order <br />112 <br />da s <br />Net Increase of <br />Net Increase/Decrease of <br />this Chan e Order <br />$12,437.00 <br />this Chan e Order <br />14 <br />da s <br />Contract Price With all <br />Contract Time Wth all <br />annrnved Chanae Orders <br />$231,556.38 <br />A roved Chan e Orders <br />126 <br />da s <br />Cumulative % Change in Contract Price: 2 30% 1 Completion Date: August 13, 2012 <br />TxCDBG reimbursement of costs approved by this change order is subject to approval by the Office. <br />~Qfk'Q COM END D: <br />tNE~RltAu orized Signature) <br />rL7 r?-- <br /> <br />APPROVED: <br />By: <br />OWNER (Authorized Signature) <br />Date: <br />ACCEPTED: <br />By: <br />CONTRACTOR (Authorized <br />Signature) <br />Date: <br />