Laserfiche WebLink
CITY OF PARIS COMPREHENSIVE PLAN <br />Appendix E- Gateway and LandscapeBuffer Design Guidelines <br />2. Transition Buffer Requirements. <br />TRANSITION BUFFER REQUIREMENTS <br />PROPOSED <br />ADJACENT ZONING <br />ZONING <br />A, <br />SF-2, <br />MF-1, <br />P <br />O <br />jvs, <br />CA <br />LI <br />HI <br />SF-1 <br />SF-3, <br />MF-2 <br />GR, <br />2F <br />C <br />A, SF-1 <br />SF-2, SF-3, 2F <br />MF-1, MF-2 <br />R <br />R <br />R <br />R <br />P <br />R <br />R <br />R <br />0 <br />R <br />R <br />R <br />NS, GR, C <br />CA <br />R <br />R <br />R <br />R <br />R <br />R <br />R <br />R <br />LI <br />R <br />R <br />R <br />R <br />R <br />R <br />R <br />R <br />HI <br />R <br />R <br />R <br />PLI <br />Landscaping <br />Landscaping should be used to mitiaate those site elements that have the greatest impact on <br />surrounding development. . <br />A. Dumpster Screening. Dumpster for solid waste located in the MF-1, MF-2, P, O, NS, GR, <br />C, CA, LI, HI and PLI districts shall be completely screened from view of roadways and <br />adjacent sites by fences, walls or vegetative screens. The screen shall provide complete <br />visual screening of the dumpster and be compatible in material and color with the principal <br />structure on the lot. <br />5:198288\WPCVinal rcpun 2-01.cluc 120 BWR <br />