My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-B Comprehensive Plan
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
02-B Comprehensive Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:10:16 AM
Creation date
6/18/2001 8:31:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
2-B
AGENDA - Type
STUDY
Description
Comprehensive Master Plan
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan, City of Paris, Texas <br />Municipal Services and Natural Features <br />Fire Service Expansion <br />The department must be well distributed to provide a very good level of fire protection to all <br />areas of the existing City. The department must meet anticipated needs of future growth. In <br />order to maintain adequate distribution of fire response companies the City approved an <br />expansion plan in 1999: <br />• Station 2 on Lamar Avenue be closed and relocated northeast, and <br />• a fourth station be opened in the southeast portion of the City. <br />Two new stations are currently under construction on Pine Mill Road and Jefferson Road. The <br />new pumpers currently on order are to replace the current Engine 2(1978 Mack would move to <br />reserve), and addition of the fourth en~ine. Nine additional firefighters will need to be added to <br />the department to staff the fourth engine and maintain the departments current standard of 3 man <br />engme companies. <br />Additional growth of the City through development or annexation may require additional <br />improvements in the Fire Department to maintain protection of the City. Other improvements <br />that may improve service levels would include: <br />• add personnel to staff the Ladder truck to better utilize a valuable resource, <br />• increase staffing levels of Engine Companies from minimum 3 man to 4 man Engine <br />Companies, <br />• add a second Rescue Company, and <br />• if growth warrants in the future, add a fifth station. <br />POLICE SERVICES <br />The City of Paris Police Department continues its objectives of maintaining a ratio of 2.1 officers <br />for every 1,000 citizens. This ratio would increase as financially possible to. Maintaining an <br />emergency operations center to meet an expanding City limits and growing population- <br />including business and residential-is the key challenge, as stated by the department. Also under <br />consideration is a new public safety building. <br />Other objectives of the department include maintaining the catastrophic/emergency plan for the <br />City, upgrading radio systems to be compatible with surrounding agencies and a new animal <br />control facility. <br />S:\98288\WPCltinal repwrt 2-0IA-- 32 BWR <br />
The URL can be used to link to this page
Your browser does not support the video tag.