'
<br />EXHIBIT D
<br />.
<br />■ - _
<br />
<br />
<br />IcnEUULE v
<br />N.,,,e t , r _
<br />rO FnP Flft') FtNLO~uAnun
<br />~)O.;UU FIELD CREW ANU EUUIFPIENT M02 IL!LAII(}N
<br />.110 Smeal Pumo Unit .
<br />. . . . . . ,
<br />. . . . . .
<br />.12U Truck-MOUnte7 Rotary Drilling Rig . .
<br />i,UU/MILE
<br />. . . . . . .
<br />.130 dickup and Water Trucks .
<br />1.UO;MILE
<br />. . . . . . . . .
<br />.140 Equipment Preparation Charye !one-[ime)
<br />O,SU/M!LE
<br />, , , , , ,
<br />.150 Subsistence anU CreN Rotation Transportation
<br />SO.UU
<br />. . . . . . . . . ,
<br />COST
<br />D2.200 DR!LLING f,ND SAMPLING - Unit Rate Basis (In addition to charge; under
<br />ltem 50.100)
<br />.210 Auger Borings (No Samples). ,
<br />.220 Urilliny - Holirnv Stem Auyers (Includiny ihin-Nalled TuDe
<br />5,00(FT.
<br />anA Split-Spoon Sampling)
<br />.221 0 - 30 feet . .
<br />. . . . . . . . . . . . .
<br />.222 30 - 50 teet . . .
<br />. . . . . . . .
<br />H.50/FT.
<br />. . . . . . . . . .
<br />.223 50 -100 feet.
<br />~
<br />q.5(1/FT.
<br />.
<br />, , ,
<br />.224 r^~dditional Charge for use of~Dril)ing Mud,~Casing or
<br />12.OU/f7.
<br />Rotary Wash Method. .
<br />. . . .
<br />.225 Additional Charge for Augeriny in Materials Ni[h
<br />1,00/FT,
<br />N-Value in excess of 50 Blows/Foo[
<br />. .
<br />.Z26 Addi[ional Charge for BentOnite-Cement Grouting
<br />1.01)/FT,
<br />uf Boreholes . . . . . . . . . . . . . . . . . . . . . . .
<br />3.25/FT.
<br />.230 Rock Coring - Double Tube Rarrel
<br />.231 Set-Up Per Hole . . . . . . . . . .
<br />. . . . .
<br />FooCaye Charyes . . . . . . . . . . . . . . . . . . . . .
<br />100.0U
<br />.:37 U - 30 tert .
<br />• . . . .
<br />`
<br />• • • . . . . • . • • ,
<br />.233 7n (?xCC'S5 Uf 30 !t'BC. .
<br />l
<br />,UU-1 i ,
<br />.J_34 In addition Lo Footdye under la ann 7b bit.
<br />UUO*F~
<br />iu aye Nill ue charqed at cost
<br />'53.10U GEOPIIYS[CAI_
<br />.110 ~iald Resistivi*y Surveys, (Incluars GeologisC, 2 7echnicidn;
<br />,
<br />and Equi;:rent . . . . . . . . . . . . . . . . . . .
<br />.120 'lc^er,ole 6annna Ray . . . . . . . . . . . . . . . . . . . . . . .
<br />lUU.00 ~lus
<br />S4,100 MONITOR WELL tNSTALLATIJN - Umt: kate Basis . . . . . . . . .
<br />QUOTED
<br />. .
<br />(In addi[ion Co char,
<br />'jz ,in~1er :tem SU,;RO) ~ ~
<br />Typical Gulf Coast Seaimancs*
<br />.101 1-30 feer, 51,4UUiwe1 1
<br />.IOL JU-Sp (PeC $1,'100/WeII
<br />.1u3 ~0-70 feet SI,iUU'well
<br />.li1a >70 ;eet i)unCed
<br />'Actual cost van es wi*h degree pf difficulty
<br />ana speeifically quuten for each ;oh,
<br />AI1 Unit Rates are in U.S. Dollars
<br />'JNOERGROUND RESOURCE MANAGEMEN7, INC,
<br />2499-R fapital of Tezas H9ghway
<br />Austin, ?eza, 78716
<br />,)12/328-0081
<br />REV(SED
<br />11ar,_h, 1'1H3
<br />
|