My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1982
>
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2017 4:39:19 PM
Creation date
7/27/2012 1:25:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
7/12/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II - TECHNICAL CONSTRUCTION SPECIFICATIONS <br />A. DESCRIPTION OF WORK <br />The Contractor shall furnish or provide all labor, equipment, <br />liability insurance, supervision and all other services and operations <br />involved in the excavating, transporting, and spreading of approximately <br />30,000 cubic yards of earth cover at the Paris Landfill. The excavation <br />site is located in the northern half of the portion of land known as <br />"Bulls 13.5 AC.", which is located in the north-east corner of the <br />Paris Landfill. (See Plate-2) The excavated material is to be spread <br />as cover over a portion of land located at the east end of the landfill, <br />generally encompassing but not limited to,the portion of land known <br />as "Bulls 40 AC.". (See Plate-2) Should the excavation site provide <br />more cover material than is required in the "Bulls 40 AC." location, <br />the remaining material will be spread as cover, in the northern part <br />of the portion of the landfill known as "Porter 46 AC." <br />Bidders are responsible for examining the work site and <br />specifications and for otherwise familiarizing themselves with the <br />work so as to be fully informed of all conditions affecting the work. <br />Work is to be paid on a cubic yard basis and the quantity to be moved <br />is subject to change. <br />B. CONTRACTOR LIABILITY <br />The Contractor assumes all liability for any death and/or personal <br />or property damage arising from his execution of the work. The City of <br />Paris assumes no liability for the actions or operations of the Contractor. <br />The City may however withhold final payment until all damage claims or <br />liens are settled. <br />II-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.