My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1982
>
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2017 4:39:19 PM
Creation date
7/27/2012 1:25:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
7/12/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. TIME AND NOTICE OF PERFORMING WORK <br />Work is to be performed only during dry conditions, and only <br />during the months of July, August and September of 1982. <br />Three working days notice are to be provided to the Engineer <br />before the Contractor initially commences work, and one working day <br />notice if he resumes work after discontinuing his operations. <br />Additionally, the Contractor shall cooperate with the Engineer in <br />providing other information and notice, necessary to determine the <br />quantities of earth being moved. <br />G. TRAFFIC CONTROL AND ACCESS MAINTENANCE <br />The Contractor must not allow the present landfill access road <br />system, to deteriorate as result of his operations, and any damage <br />he causes must be promptly repaired, so that user access is assured <br />at all times. In addition the Contractor must provide for traffic <br />control, if necessary to insure the safety of landfill users and <br />personnel. The Contractor is responsible for taking any and all other <br />necessary precautions to insure the safety of landfill users and <br />personnel. <br />H. COMMON EXCAVATION <br />The earth to be excavated is located on a shallow hilltop in the <br />northern half of the portion of the landfill known as "Bulls 13.5 AC", <br />which is located in the north-east corner of the Paris Landfill. (See <br />plate-2). The hilltop is to be excavated to various depths ranging from <br />approximately one to six feet. The exact depth of excavation will depend <br />on the currently existing contours, but generally the deeper cut will be <br />in the northern two-to-three-hundred feet of "Bulls 13.5 AC." and will <br />feather out to zero, at a location four-to-five-hundred feet south of the <br />northern property line. <br />The finished grade after excavation is to be shaped to drain in <br />a southerly direction to a point where the grade will intersect an <br />east-west drainage course which lies approximately six hundred feet <br />south of the north property line. Alternate drainage schemes may be <br />required by the engineer if it appears to be in the cities interest to <br />do so. <br />II-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.