My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1982
>
2187 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF JUNE 1982 APPROVE ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2017 4:39:19 PM
Creation date
7/27/2012 1:25:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
7/12/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Personnel will be responsible for compaction. The Contractor <br />is to distribute cover material in loose fill lifts not to exceed 12 <br />inches and coordinate his operations,with City Personnel to facilitate <br />compaction. Cover material must be free of trash, logs, boulders, and <br />other foreign debris, and the final surface must be worked by the <br />Contractor, so that it meets or exceeds all the requirements of the <br />paragraph entitled Finished Gradings. <br />L. FINISHED GRADING <br />All areas disturbed by Contractor, excepting trencii excavations, <br />shall be restored to finished grade condition. Finished grade shall be <br />shaped to drain and blend well with the topography of the surrounding <br />terrain. Finished grade shall have a minimum of one and maximum of two <br />feet of trash free earth and shall be free of large ruts, logs, boulders, <br />and all other foreign debris. The Contractor must dispose of all trash, <br />logs, boulders, and other debris which he might encounter, by trans- <br />porting it to the proper area of the landfill. Any access roads disturbed <br />by the Contractor shall be restQred to their original condition, including <br />but not limited to, resurfacing and ditching. Drainage routes disturbed <br />by the Contractor shall be restored to original condition, or a suitable <br />substitute route must be constzucted. <br />II-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.