Laserfiche WebLink
July 1, 1982 <br />ADDENDUM TWO <br />of <br />SPECIFICATIONS AND CONTRACT DOCUMENTS FOR <br />EARTHWORK AT PARIS SANITARY LANDFILL <br />The estimated quantity of earth to be excavated, <br />transported & spread is referenced in several locations <br />in the specifications & contract documents, as 30,000 <br />cubic yards. This estimated quantity shall be reduced <br />to 20,000 cubic yards. <br />Due to rain the foliage that was dozed during the <br />City clearing operation, was not burned. The contractor <br />is not required to burn this debris but must push it into <br />a central pile. The approximate location of this pile <br />is to be 600 or 700 feet south of the North boundary of <br />"Bulls 13.5 AC." tract and 100 to 150 feet East of the <br />West boundary. <br />