Laserfiche WebLink
PART B. DESCRIPTION OF PLANNING AND URBAN ENVIRONMENTAL DESIGN COSTS <br />Construction plans, specifications and bid documents are to be <br />done by a consulting engineering firm for water, paving and park <br />facilities projects. Estimated cost of this activity is $29,000.00 <br />D Check if continued on additionalpage(sJ and attach. <br />Line <br />PART C. GENERAL ADMINISTRATfON COSTS <br />(See insiructions for descriptions of administration actrvities before <br />classifying costs below.) <br />MOUNT <br />FOR HUD <br />USE ONLY <br />1 <br />General Management, Oversight and Coordination <br />$ 5,000 <br />$ <br />2 <br />Indirect Costs (Allowable if charged pursuant to a cosf allocation plan) <br />3 <br />Citizen Participation <br />4 <br />Environmental Studies Necessary to Comply With Environmental Regulations <br />5 i <br />Other fLisfl <br />a <br />Rehabilitation Administratio <br />$ <br />4,500 <br />b <br />c <br />d <br />e <br />6 <br />Total General Administration Costs (Sum of Lines 1 thiougih 5) <br />$ 9,500 <br />$ <br />Page 3 of 4 pages HUD-7067 (6-78) <br />