My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1808 RES CITY COUNCIL AT ITS MEETING ON 9TH DAY OF MAY 1977 APPROVED ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1970-1979
>
1977
>
1808 RES CITY COUNCIL AT ITS MEETING ON 9TH DAY OF MAY 1977 APPROVED ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 2:14:42 PM
Creation date
8/3/2012 11:01:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
6/13/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEY CONTROL GAS PUl9P SPECIFICATIONS <br />1. Pumping Units <br />A. Air Separators <br />1. The pumping units wi11 be not less than 14 qalZons per minute <br />models. <br />2. The units wi11 be the vazle type pumpinq unit and integraZ cast <br />aluminum air separator. <br />B. Registers <br />1. The pumping units shall have non-computer interlock reading <br />both the front and back of the pump. <br />2. There wi11 be not less than a 1,000 gallon delivery and nat <br />less than a 1 million gallon totalizer. <br />C. Meters <br />1. The meters shall be four piston positive displacement, exter- <br />na1 accuracy adjustment or nutatinq disc meters with external <br />adjustment. <br />D. Motors <br />1. The motors shall be not Iess than 113 horsepower. <br />2. They shall be explosion-proof with a thermal overload protector. <br />3. There shall be a built-in switch on each unit. <br />4. The units wi11 have standard 120 voltaqe capability. <br />E. Hose and Nozzle <br />1. The hose shall be not Iess than 314" in diameter and not Iess <br />than 14' in length. <br />2. There wi1Z be one (1) standard automatic closing nozzZe; and <br />two (2) no-lead automatic closing centers. <br />G. A11 models shall have the underwriters approval and certification. <br />II. Key Control Systems <br />A. General <br />1. .The key control systems shall be mourited on and connect_ed to the <br />pumping units. <br />2_ One pumpinq unit shall have a 20 key control mounted on the side <br />of the unit. <br />3. The second pumping unit s12a1l have a 25 key control mounted on <br />, the side of the unit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.