My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-K T-Hangar CO One
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06-K T-Hangar CO One
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:00 AM
Creation date
9/6/2001 5:47:34 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-K
AGENDA - Type
RESOLUTION
Description
Change Order - Nested T-Hangar, Cox Field
AGENDA - Date
9/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14:08 FAX <br /> <br />BWR - Tyler <br /> <br />~OOl <br /> <br />ll llll! BUCHER, WILLIS & RATLIFF <br />IBIIIIL <br /> <br />To: Tommy Haynes <br /> City of Paris <br /> <br />Telephone: 903-7B5-7511 <br />FAX # _ g03-TB4-1798 <br /> <br />From: <br /> <br />Title: <br /> <br /> FACSIMILE <br />Frenk Davis <br /> <br />BWR Project No. <br />Number of Pages <br />including Cover Page: 3 <br /> <br />Date: Auqust .30, 2001 <br /> <br />Re; <br /> <br />Airport Site Preparation - Change Order No. 1 <br /> <br />Notes: <br /> <br />Attached are the change order forms for the site preparation around the new T-Has,gars. The <br />Change Order Detail shows the Water Line adjustment, but you wLll need to verify the amount <br />shown {or this item. Janice and Steve Hodges will need to prepare the final change o~der forms <br />that you use and present tot he Council. <br /> <br />The original quantity of earthwork was calculated using a typical section of the cha]xnel to be <br />filled. The actual channel varies in depth and width and therefore required substantially more <br />dirt to fill. Also, the storm sewer pipe required an addifion~ amount of dirt to provide, sufficient <br />cover over the north end of the pipe. <br /> <br />The water line adjustment is required due to a conflict in grades between the exist/ng water Line <br />and the proposed storm sewer 1/ne. Without this adjustment, it would have been requi red for the <br />storm sewer line to be installed at a greater depth resulting in significantly more trench safety and <br />increasing the length of the pipe. <br /> <br />B. Frank Davis, Jr., P.E., R.P.L.5. <br />Project Manager <br />Bucher, WiLls & Ratliff Corporation <br />601 Shelley Drive, Sutte 202 <br />Tyler, Texas 75701-9439 <br /> <br />Telephone: 903-581-7844 <br />l~ax: 903-581-0178 <br />E-mail: bdavis@bwrcorp.com <br /> <br />· 601 SHELLEY ~)RWE, SUITE 202 · TYLER, TEXAS 75701-943~ · ~O3/581-7844 · FAX: 903/58,1-0178 III <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.