My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-APPROVE ABATEMENT REQUEST OF CAMPBELL SOUP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
08 August
>
08.27.12
>
11-APPROVE ABATEMENT REQUEST OF CAMPBELL SOUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 3:09:06 PM
Creation date
8/23/2012 2:58:58 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL AGENDA ITEM BRIEFING SHEET <br />Submittal Date: <br />Originating Department: <br />Presented By: <br />Agenda Item No.: <br />08/22/2012 <br />Council Date: <br />PEDC <br />Steve Gilbert, Executive Director <br />11. <br />08/27/2012 <br />RECOMMENDED MOTION: <br />Approve abatement request of Campbell Soup. <br />PoLicY IssuE(s): <br />This abatement request complies with the abateinent policies, guidelines and criteria approved by the <br />Paris City Council on August 13, 2012 in Resolution 2012-072. This tax abatement helps maintain and <br />enhance the commercial and industrial economic and employment base of the Paris area far the long- <br />term interest and benefit of the City of Paris and its citizens. <br />BACKGROUND: <br />Campbell Soup Supply Company LLC, (Campbell) headquartered in Camden, Ncw Jersey, has determined it is in thcir best interest to <br />invest $45,400,000 in real estate and equipment at their Paris, Texas plant to install a new product line described as follows: <br />• Rcady-to-eat soup line, including preparation, blending, filling/chilling, packaging and finished goods warehouse. <br />• Refrigeration equipment and infrastructure to support the required project chiller, conditioned manufacturing, prod uct/i ngredi ent <br />storage and refrigerated dock spaces. <br />• Ingredient preparation equipment, including hand scaling cquipment, extractor for bulk frozen ingredients, 4 frozen ingredient and 2 <br />dry ingredient batching stations and fresh cream/milk handling system. <br />• Prcmix systems, including emulsion and thickener systems. <br />• Blending ccll, including 4 blending kettles complete with ingredient delivery and blending control systems. <br />• Filling arca, including cup tiller, bulk pouch filler, and single scrve pouch tiller. <br />• Product chiller with infeed mechanism for pouches and cups. <br />• Packaging arca, induding the following for pouchcs: carton erector, manual casepacking station, checkweighing station and case <br />sealer; and the following for cups: 2 product accumulators, overcapper, labeler, sleever, casepacker; and paletizer for pouches and cup <br />products; All-interconecting conveyance. <br />• Refrigeratcd finished goods warehouse with gravity flow i acking, including dock with dock doors and exterior paving. <br />Campbell estiinates this new product line and associated technologies will create 68 new jobs over thc lifie of the agreement, and Campbell <br />' <br />this agreement. <br />agrees to retain sufticient einployment levels to efficiently operate and suppon its Paris plant during the term of <br />The total economic benefit to Campbell of the proposed 7-Year, 100% tax abatement is $2,884,710. <br />BOARD/COMMISSION RECOMMENDATION: <br />Approve abatement request as proposed. <br />EXHIBITS: <br />Resolution <br />ACTION: <br />BUDGET INFO: <br />❑ Financial Report ❑ Minute Order <br />Expense <br />$ <br />❑ Department Report E Resolution <br />Budgeted Amt. <br />$ <br />❑ Presentation ❑Ordinance <br />y'I'D Actual <br />$ <br />❑ Public Hearing ❑ Other <br />Acct. Name <br />Acct. Number <br />FISCAL NOTES: <br />Citv of Paris Revised 2/04/08 <br />~ - 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.