My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 02050 DEMOLITION <br /> <br />SECTION 02050: DEMOLITION <br />PART 1 - GENERAL <br /> <br /> 1.01 GENERAL CONDITIONS: <br /> <br /> A. As specified in Divisions 00 and 01 apply to all work in this Section.. <br /> <br /> 1.02 DESCRIPTION OF WORK: <br /> <br /> Provision of demolition work of materials and components to be discarded and <br /> dismantlement of materials and components which are to be retained for reuse, as <br /> indicated on drawings or as required for integration of new materials. <br /> <br /> 1. Remove concrete sidewalk/walkway at perimeter of building, <br /> 2. Remove all non-historic wood shelving, cabinetr3, and miscellaneous <br /> casework, <br /> 3. Remove all piping and cap outside wall at 3" above grade, <br /> 4. Remove all temporary plywood, <br /> 5. Remove all non-repairable plaster and lath on interior walls, <br /> 6. Salvage all doors and windows for restoration and reuse, <br /> 7. Salvage of existing roofing material is NIC, <br /> 8. Removal of all roof substrate materials between file and wood decking is <br /> NIC, <br /> 9. Remove all electrical conduit, wires, boxes, and service to building. <br /> <br /> 1.03 GENERAL CONDITIONS <br /> <br /> A. It shall be the responsibility of the Contractor(s) to examine the project site and <br /> determine for himself the existing conditions. All work in this section shall be <br /> coordinated with affected work in other Sections. <br /> <br /> B. Obvious conditions which exist on the site shall be accepted as part of the work, <br /> even though they may not be clearly indicated on the drawings and/or <br /> described herein, or may vary there from. <br /> <br /> C. All debris of any kind accumulated from the work of this Section shall be disposed <br /> off site. <br /> <br /> D. Burning of any debris on-site will not be permitted. <br /> <br /> E. Permits, Notice, Etc.: <br /> <br /> 1. The Contractor(s) shall procure and pay for all necessary permits or <br /> certificates that may be required in connection with this work. <br /> <br /> 2. The Contractor(s) shall serve proper notice and consult with the Owner's <br /> Construction Manager regarding any temporary disconnection of <br /> Section 02050 <br /> Page 1-4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.