Laserfiche WebLink
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ^RCHIT[CTS <br /> July 10, 2001 <br /> <br /> their work, after completion of painting operations. At the completion of work of <br /> other trades, touch-up and restore all damaged or defaced painted surfaces. <br /> <br />PART 4. SCHEDULE OF PAINTING AND FINISHIN(;: <br /> <br />4.01 PAINT SYSTEMS: <br /> <br /> A. General: Paint manufacturers must be top-quality brands: <br /> 1. Oil-based Primers and Paints shall be as manuf:tctared bv Devoe, Sherwin- <br /> Williams, Olympia or Architect approved equals. <br /> <br /> 2. Latex-based Primers and Paints shall be as manufactured by Devoe, Sherwin- <br /> Williams, Olympia or Architect approved equals. <br /> <br /> 3. Shellac shall be as manufactured by Kre,ner Pigmcms Inc.. 228 Elizabeth Street, <br /> NY, New York 10012, 212-219-2394. <br /> <br /> 4. Gel Stain Varnish shall be as manufactured by Bartley's. Contractor shall verif~ <br /> final selection of paint colors <br /> <br /> B. Exterior Surfaces: <br /> 1. Wood Trina: <br /> <br /> one coat Oil Based Primer <br /> two coats Oil based Gloss Paint <br /> <br /> 2. Door & Window Surfaces (including frames and ~'im): <br /> <br /> one coat Oil Based Primer <br /> two coats Oil Based Gloss Paint <br /> <br /> 3. Newsstand Wood paneling & Trim <br /> <br /> three coats Bleached White Shellac <br /> Kremer 6044 Bleached Shellac <br /> <br /> 4. All Other Exposed Wood Surfaces <br /> <br /> one coat Oil Based Primer <br /> two coats Oil Based Gloss Paint <br /> <br /> Section 09900 <br /> Page 9-11 <br /> <br /> <br />