My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1993 Specifications U.S. Department of Transportation <br /> Federal Highway Administration <br /> <br /> SPECIAL PROVISION <br /> <br /> Form FHWA-1273 <br /> <br /> Required Contract Provisions Federal-Aid Construction Contracts <br /> <br /> I. General 1 <br /> II. Nondiscrimination 2 <br /> III. Nonsegregated Facilities 6 <br /> IV. Payment of Predetermined Minimum Wage 6 <br /> V. Statements and Payrolls 11 <br /> VI. Record of Materials, Supplies and Labor 13 <br /> VII. Subletting or Assigning the Contract 13 <br /> VII1. Safety: Accident Prevention 14 <br /> IX. False Statements Concerning Highway Projects 14 <br /> X. Implementation of Clean Air Act and Federal Water Pollution Control Act 15 <br /> XI. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion 16 <br /> XII. Certification Regarding Use of Contract Funds for Lobbying 19 <br /> <br /> ATTACHMENTS <br /> A. Employment Preference for Appalachian Contracts (included in Appalachian contracts <br /> only) <br /> <br />I. General. <br /> <br />1. These contract provisions shall apply to all work performed on the contract by the contractor's <br />own organization and with the assistance of workers trader the contractor's immediate <br />superintendence and to all work performed on the contract by piecework, station work, or by <br />subcontract. <br /> <br />2. Except as otherwise provided for in each section, the contractor shall insert in each <br />subcontract all of the stipulations contained in these Required Contract Provisions, and further <br />require their inclusion in any lower tier subcontract or purchase order that may in turn be made. <br />The Required Contract Provisions shall not be incorporated by reference in any case. The prime <br />contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor <br />with these Required Contract Provisions. <br /> <br />3. A breach of any of the stipulations contained in these Required Contract Provisions shall be <br />sufficient grounds for termination of the contract. <br /> <br />4. A breach of the following clauses of the Required Contract Provisions may also be grounds <br />for debarment as provided in 29 CFR 5.12: <br /> <br /> 1-20 Form FHWA- 1273 <br /> Rev. 12-93 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.