Laserfiche WebLink
een able . Due to the retirement this year of significant utilities-reia~dri ent~he b dget sfor both the <br />include a significant amount of new and replacement equ p <br />water plant ($160,000), and the sewer plant ($123,500), at Lake Pat Mayse ($55,000), and <br />also at various sewer lift stations ($66,000). <br />000 for drainage work. <br />. I have added $80,000 for street repairs and $40, <br />. I have added $1.2 million for replacement of some of our °~S Vlumess ewastewater t damagel and <br />in hopes of reducing outages, breaks, impacts on sewer pl <br />repair costs, and placed $55,800 in the budget to purchase equipme 0 , o we can move <br />this work in-house. We actually began planning these projects o July 24 will <br />use <br />-house quickly once the appropriation is approved; for tht a am at his level n future <br />engineering. We may not be able to fund a line replacement pogr term years, but we absolutely need to make a commatmanto°ed n May o eplaoceg 5 o d <br />replacement program. A n a d d i t i o n a l $ 3. 4 0 5 m i l l i o n p pr <br />water lines as part of a Texas Water Development Boar~l~ oa tha °a year and wi 1 not be <br />program, actual construction is not expected to begin fo <br />complete unti12014. <br />. We have budgeted $400,000 for a new SCADA system. This vital communication system <br />cost might be able to be deferred, but the need will not go away, so the sooner we can <br />address it the better. <br />. I have included $13,165 for merit raises for certain exceptional employees. <br />. Not in this budget year, but relatively soon, we will need to b~gi ~orkl o]o can be de erre , <br />and ultimate construction of a large new wastewater plant. <br />but operating and maintenance costs in the meantime are considerably higher, while <br />dependability is lower. <br />UTILITIES FUND <br />2030-11 <br />2011-12 <br />2012-13 <br />Increase <br />Percent <br />86 <br />4 <br />472 <br />116 <br />109,280 <br />114,596 <br />5,316 <br />. <br />Warehouse <br />, <br />661 <br />453 <br />579,906 <br />591,092 <br />11,186 <br />1.93 <br />Billing & Collecting <br />, <br />000 <br />140 <br />1 <br />11140,000 <br />1,567,000 <br />427,000 <br />37.46 <br />Inter-fund Transfers <br />, <br />, <br />75 <br />221 <br />865 <br />2 <br />3,030,817 <br />165,596 <br />5•78 <br />Water Production <br />2,489,4 <br />8 <br />, <br />, <br />673 <br />496 <br />1 <br />1,573,167 <br />76,494 <br />5.11 <br />Water Distribution <br />1,331,25 <br />, <br />, <br />652 <br />989 <br />123,216 <br />14.22 <br />Sewer Maintenance <br />589,927 <br />866,436 <br />8 <br />, <br />229 <br />195 <br />2 <br />97,301 <br />4.64 <br />Sewer Treatment <br />2,032,410 <br />2,097,92 <br />, <br />1 <br />817 <br />34 <br />8.55 <br />905 <br />307 <br />407,250 <br />442,067 <br />, <br />Lift Stations <br />, <br />- <br />1,200,000 <br />1,200,000 <br />100.00 <br />Line Replacements <br />_ <br />13,165 <br />13,165 <br />100.00 <br />Contingency <br />- <br />3,823,250 <br />1,694,895 <br />1Zg,355) <br />(2, <br />(55.67) <br />Utilities Debt <br />461,108 <br />8 <br />13,385,944 <br />13,411,680 <br />25,736 <br />0.19 <br />TOTAL <br />, <br />32 <br />