Laserfiche WebLink
1.1 The effective date of this AGREEMENT is the 27t�' day of August, 2012, with tax <br />abatement beginning with the tax year commencing January 1, 2014, and expiring on December <br />31, 2020. <br />II. <br />Area to be Improved <br />2.1 The PROJECT consists of new building modifications to the real property of the <br />OWNER, and the addition and installation of equipment and personal property described in <br />Article III, below, all to be performed by OWNER within an existing building of the OWNER at <br />the OWNER'S plant in Paris, Lamar County, Texas. Collectively, all such improvements which <br />are the subject hereof shall be called the "IMPROVEMENTS". The IMPROVEMENTS shall be <br />located upon and within the OWNER'S current facilities consisting of the OWNER'S land also <br />described in Exhibit A, attached hereto and made a part hereof for all purposes (as are all <br />Exhibits which are mentioned herein), and within the building at the location shown within the <br />drawings attached hereto as Exhibit B. The land and building are herein called the <br />"PROPERTY". <br />III. <br />Improvements <br />3.1 The installation of the IMPROVEMENTS will require engineering and design <br />work, procurement of equipment, infrastructure and utilities modifications and electrical and <br />mechanical installation at the PROPERTY. The IMPROVEMENTS are being made to enable <br />the OWNER to manufacture fresh refrigerated soups in pouch and cup formats. The <br />IMPROVEMENTS are described as follows: <br />A. To the real property of OWNER, building modifications to segregate "Ready To <br />Eat" ("RTE") production from remaining manufacturing spaces to provide a <br />sanitary environment for RTE products, and to support specific pieces of <br />manufacturing equipment. This includes floor, wall, and ceiling finishes, as well <br />as some structural changes to the building. Modifications will occur in 5 major <br />areas of the RTE space: preparation, blending, filling/chilling, packaging, and <br />finished goods warehouse. <br />B. Refrigeration equipment and infrastructure to support the required product chiller, <br />conditioned manufacturing spaces, product/ingredient storage spaces, and <br />refrigerated dock. <br />C. Ingredient preparation equipment, including Hand Scaling equipment; an extractor <br />for bulk frozen ingredients; 4 frozen ingredient and 2 dry ingredient batching <br />stations; and fresh cream/milk handling system. <br />D. Premix systems, including emulsion and thickener systems will be relocated into <br />the new space. <br />