Laserfiche WebLink
RECEIVED <br /> <br /> BID FORM <br /> <br />GATEWAY PROJECT REPAIR <br /> <br />CONTRACT IDENTIFICATION AND NUMBER: 41.L <br /> <br />THIS BID IS SUBMITTED TO: The Honorable Mayor and City Council <br /> City Hall <br /> 135 SE 1st Street <br /> Paris, Texas 75460 <br /> <br />1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement <br />with CITY in the form included in the Contract Documents to perform and furnish all Work as <br />specified or indicated in the Contract Documents for the Contract Price and within the Contract Time <br />indicated in this Bid and in accordance with the other terms and conditions of the Contract <br />Documents. <br /> <br />2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and <br />Instructions to Bidders, including without limitation those dealing with the disposition of Bid <br />security. This Bid will remain subject to acceptance for sixty days after the day of Bid opening. <br />BIDDER will sign and submit the Agreement with the Bonds and other documents required by the <br />Bidding Requirements within fifteen days after the date of OWNER'S Notice of Award. <br /> 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: <br /> (a) BIDDER has examined copies of all the Bidding Documents and of the following Addenda, <br /> receipt of all which is hereby acknowledged. <br /> Date ,q/A, Number <br /> <br />Co) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work <br />site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, <br />progress, performance or furnishing of the Work. <br />(c) BIDDER has studied carefully all reports and drawings of subsurface conditions and drawings <br />of physical conditions. <br />(d) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and <br />carefully studying) all such examlnat~ons, lnvesttgatxons, explorations, tests and studies (in addition <br />to or to supplement those referred to in (c) above) which pertain to the subsurface or physical <br />conditions and the site or otherwise may affect the cost, progress, performance or furnishing of the <br />Work as BIDDER considers necessary for the performance or furnishing the Work at the Contract <br />Price, within the Contract Time and in accordance with the other terms and condition of the Contract <br />Documents. <br /> <br /> (e) BIDDER has reviewed and checked all information and data shown or indicated on the Contract <br /> Documents with respect to existing Underground Facilities at or contiguous to the site and assumes <br /> responsibility for the accurate location of said Underground Facilities. No additional examinations, <br /> <br />9 <br /> <br /> <br />