Laserfiche WebLink
This bid has been submitted by using the required technical <br />specifications as noted in the yellow sheets in the contract <br />documents package. <br /> <br />The original builder of the Gateway project deleted 4 prod- <br />cts and applications that was noticed in an on-site inspec- <br />tion before this bid was submitted. <br /> <br />1. Reinforcing mesh was not 100% applied. <br /> <br />2. Base coat was completely omitted. (page 2-H) <br /> <br /> 3. Primer-Sealer (page 2-D) was not applied. <br /> <br /> 4. Primer (page 3-I) was not applied. <br /> <br />All required materials and applications will be strictly <br />adhered to in this project and on-site workmanship,will have <br />the highest quality and integrity. <br /> <br />Respectfully, <br /> <br />Danny Midey <br /> <br />Midey Construction <br /> <br /> <br />