My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-A Gateway Repair Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
11 - November
>
November 12, 2001
>
07-A Gateway Repair Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:20:39 AM
Creation date
11/7/2001 11:34:49 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-A
AGENDA - Type
RESOLUTION
Description
Gateway Repair Project - Award Bid
AGENDA - Date
11/12/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
effective to assign to ENGINEER nn~ duty or authority to <br />supervise or direct thc furnishing or performance of thc Work <br />or any duty or authority to undertake rcsponslbi[ity contrary <br />to thc provisions o~ paragraph 9. I 5 or 9.16. <br /> <br /> 9.15. ENGINEER will not be responsible for CON- <br />TRACTOR's means, methods, techniques, sequences or pro- <br />cedures of construction, or the safety prccautions and pro- <br />grams incident thereto, and ENGINEER will not be respon- <br />sible for CONTRACTOR's failure to perform or furnish the <br />Work in accordance with the Contract Documents. <br /> <br /> 9.16. ENGINEER will not be responsible for the acts or <br />omissions of CONTRACTOR or of any Subcontractor, any <br />Supplier. or of any other person or organization performing <br />or furnishing any of the Work. <br /> <br /> 10.4.3. changes in thc Contract Price or Contract Time <br /> which embody the substance of any writicn d~Ersion ~en- <br /> tiered by ENGINEER pursuant to paragraph 9.11: <br /> provided that, in lleu of executing any such Change Order, <br />· an appeal may be taken from nny such decision in accordance <br />with the provisions of the Contract Documents and applicable <br />Laws and Regulations, but during any such appeal, CON- <br />TRACTOR shall carry on the Work and adhere to thc prog- <br />ress schedule as provided in paragraph 6.'2.9. <br /> <br /> 10.5. If notice of any change affecting the general scope <br />of the Work or the provisions of the Contract Documents <br />(including, but not limited to, Contract Price or Contract <br />Time) is required by the provisions of any Bond to be given <br />to a surety, the giving of any such notice will be CONTRAC- <br />TOR's responsibility, and the amount of each applicable Bond <br />will be adjusted accordingly. <br /> <br />ARTICLE 10--CHANGES IN THE WORK <br /> <br /> 10.1. Without invalidating the Agreement and withoumotice <br />to any surety, OWNER may, at any time or from time to <br />time, order additions, deletions or revisions in the Work; <br />these will be authorized by a Written Amendment, a Change <br />Order, ora WorkDirective Change. Upon receipt of any such <br />document. CONTRACTOR shall promptly proceed with the <br />Work involved which will be performed under the applicable <br />conditions of the Contract Documents (except as otherwise <br />specifically provided). <br /> <br /> 10.2. If OWNER and CONTRACTOR are unable to agree <br />as to the extent, if any, of an increase or decrease in the <br />Contract Price or an extension or shortening of the Contract <br />Time that should be allowed as a result of a Work Directive <br />Change, a claim may be made therefor as provided in Article <br />II or Artlcln 12. <br /> <br /> 10.3. CONTRACTOR shall not be entitled to an increase <br />in the Contract Price or an extension of the Contract Time <br />with respect to any Work performed that is not required by <br />the Contract Documents as amended, modified and supple- <br />mented as provided in paragraphs 3.4 and 3.5, except in the <br />case of an emergency as provided in paragraph 6.22 and <br />except in the case of uncovering Work as provided in para- <br />graph 13.9. <br /> <br /> 10.4. OWNER and CONTRACTOR shall execute appro- <br />priate Change Orders (or Written Amendments) covering: <br /> <br /> I0.4.1. changes in the Work which are ordered by <br />OWN ER pursuant to paragraph 10. I, are required because <br />of acceptance of defective Work under paragraph 13.13 or <br />correcting defecth,e Work under paragraph 13.14. or arc <br />agreed to by thc parties; <br /> <br /> 10.4.2. changes in t he Contract Price or Contract Time <br />which are agreed to by the panics; and <br /> <br />ARTICLE l I---CHANGE OF CONTRACT PRICE <br /> <br /> I1.1. The Contract Price constitutes the total compen- <br />sation (subject to authorized adjustments) payable to CON- ' <br />TRACTOR for performing the Work. All duties, responsibil- <br />ities and obligations assigned to or undertaken by CON- <br />TRACTOR shall be at his expense without change in the <br />Contract Price. <br /> <br /> 11.2. The Contract Price may only be changed by a Change <br />Order or by a Written Amendment. Any claim for an increase <br />or decrease in the Contract Price shall be based on written <br />notice delivered by the party making the claim to the other <br />party and to ENGINEER promptly (but in no event later than <br />thirty days) after the occurrence of the event giving rise to <br />the claim and stating the general nature of the claim. Notice <br />of the amount of the claim with supporting data shall be <br />delivered within sixty days after such occurrence (unless <br />ENGINEER allows an additional period of time to ascertain <br />more accurate data in support of the claim) and shall be <br />accompanied by claimant's written statement that the amount <br />claimed covers all known amounts (direct, indirect and con- <br />sequential) to which the claimant is entitled as a result of the <br />occurrence of said event. All claims for adjustmeni in the <br />Contract Price shall be determined by ENGINEER in accor- <br />dance with paragraph 9.11 if OWNER and CONTRACTOR <br />cannot otherwise agree on the amount involved. No claim <br />for an adjustment in the Contract Price will be valid if not <br />submitted in accordance with this paragraph 11.2. <br /> <br /> 11.3. The value of any Work covered by a Change Order <br />or of any claim for an increase or decrease in the Contract <br />Price shall be determined in one of the following ways: <br /> <br /> 11.3.1. Where the Work involved is covered by unit <br />prices contained in thc Contract Documents. by applica- <br />tion of unit pdces to the quantities of the items involyed <br />(subject to thc provisions of paragraphs 11.9.1. through <br />11.9.3, inclusive). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.