AGREEMENT <br /> <br />THIS AGREEMENT is dated as of the 12th day of November in the year 2001 by and between City <br />of Paris, Paris, Texas, (hereinafter called OWNER) and Hansen & Associates, Inc. (hereinafter called <br />CONTRACTOR). <br /> <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br /> <br />Article 1. WORK. <br /> <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: reconstruction of structural framing, and exterior insulation <br />and finish system application and other appurtenant construction, complete in place. <br /> <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: GATEWAY PROJECT REPAIR. <br /> <br />Article 2. ENGINEER. <br /> <br />The Project has been designed by City Engineer, City of Paris, Paris, Texas, or his authorized <br />representative, who is hereinafter call ENG1NEER and who is to act as OWNER'S representative, <br />assume all duties and responsibilities and have the rights and authority assigned to ENG1NEER in the <br />Contract Documents in connection with completion of the Work in accordance with the Contract <br />Documents. <br /> <br />Article 3. CONTRACT TIME. <br /> <br />3.1 The Work will be substantially completed within 45 days from the date when the Contract <br />Time commences to run as provided in paragraph 2.3 of the General Conditions, and completed and <br />ready for final payment in accordance with paragraph 14.13 of General Conditions within 60 days <br />from the date when the Contract Time commences to run. <br /> <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this <br />Agreement and that OWNER will suffer financial loss if the Work is not completed within the times <br />specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 <br />of the General Conditions. They also recognize the delays, expense and difficulties involved in <br />proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not <br />completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR <br />agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER <br />One hundred and no/100 dollars $100.00 .) <br />for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the <br />Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, <br /> <br /> <br />