Laserfiche WebLink
505 <br />Texas Department of Agriculture <br />Construction Contract Change Order <br />�Wfl@f (Contractor Locality): COC1t�8Ct FOf (project description): R@91011 5 <br />City of Paris RE-BID Downtown Sidewalk <br />P.O. Box 9037 Replacement — Clarksville St. TxCDBG Contract No. <br />Paris, TX 75461 710222 <br />Project Location: Paris, Texas Change Order No. 5 and <br />Final <br />Contractor: Engineer: <br />Bobby Smallwood Construction Hayter Engineering, Inc. <br />1795 NE 17�' 4445 SE Loop 286 <br />Paris, TX 75460 Paris, TX 75460 <br />Owner is requesting TDA review to determine eligibility of change order expenses. <br />Chans�es to Existins� Line Items (Items from original bid or added in previous change <br />order onl <br />Item Item Description Current Unit Unit Price Change in Change in <br />No. Quanti Quantit +/_ Contract Price <br />3 New sidewalk 6054 SF 8.75 (164) (�,435.00) <br />19 Flagpole inserts 26 EA 87.50 {5) (437.50) <br />A2 New sidewalk 331 SF 8.75 (20) (1�5.00) <br />New Items Reauested (Items without a unit price in the original bid) <br />Provide Explanation (attach separate documentation if necessary): <br />Item Item Description Unit Unit Price Change in Change in <br />No. Quantit +/- Contract Price <br />Chanae in Contract Price Chans�e in Contract Time <br />Original Contract Price: $237,006.62 Original Contract Time: 105 days <br />Previous Change Order(s) Net Change From Previous <br />No. 1 to No. 4 $2,221.52 Chan e Orders 21 da s <br />Contract Price Prior to Contract Time Prior to <br />this Chan e Order $234,785.10 this Chan e Order 126 da s <br />Net Decrease of Net Increase/Decrease of <br />this Chan e Order $2 047.50 this Chan e Order 24 da s <br />Contract Price With all Contract Time With all <br />A roved Chan e Orders $232,737.60 A roved Chan e 150 da s <br />Cumulative % Change in Contract Price: 1.80% <br />% <br />Notice: * Generally, a cumulative change in the contract price in excess of 25% cannot be aqproved. <br />° rceimnursement ot costs submitted in this change order are subject to approval by the Department. <br />See TxCDBG Project Implementation Manual Section 5.2.5. <br />