Laserfiche WebLink
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zoning Commission <br />FROM: Shawn Napier, P.E <br />Director of Engin ng Planning & Development <br />DATE: September 24, 2012 <br />SUBJECT: East Paris Baptist Church 259, Block A, Lot 1 Final Plat <br />I have reviewed the final plat of the above referenced addition. It appears that the final plat <br />complies with the City of Paris subdivision regulations with the following exception. <br />1. Show and label the existing Right-of-Way width and street width for Collegiate Drive. <br />I recommend approval of the final plat upon submission of a corrected mylar copy with <br />signatures of the surveyor and owner prior to noon on October 5, 2012. <br />cc: John Godwin, City Manager <br />Kevin Whitley, R.P.L.S., Hayter Engineering, Inc. <br />East Paris Baptist Church <br />� <br />