My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) <br />Concrete embedment <br />pounds per square inch at 28 days. D <br />embedment or encasement will be mix <br />Concrete for the sides and top, if specif <br />more than three (3) inches. Concrete q <br />sack) per cubic yard, and shall contait <br />detailed design mix shall be submitted <br />testing as outlined in the Special Cond <br />After pipe joints aze <br />t encasement shall have a minimum compressive strength of 2000 <br />r mix will not be permitted. The concrete cushion portion of the <br />d moist or damp to give a slump of not more than one (1) inch. <br />d, shall be mixed to obtain a slump of not ]ess than one (1) inch nor <br />all contain not less than 4.5 sacks of cement (94 Ibs. of cement per <br />not more than 0.9 gallons of water per sack of cement. A more <br />ry the Contractor. Samples of this concrete shall be furnished for <br />of these specifications. <br />the voids at the joints in the embedment section shall be filled <br />with concrete, and the embedment sh be brought up to proper grade. Where concrete is placed over or <br />along the pipe, it shall be placed in suc manner as not to damage or displace the joints or displace the pipe. <br />Caze shall be taken in the placement of oncrete to assure that a uniform pad, free of voids and of specified <br />thickness, is constructed under the ent' e pipe section. <br />A cleavage line betwee the base concrete and the side embedment concrete will not be <br />allowed. Backfilling shall be done in a cazeful manner and at such time, after concrete embedment or <br />encasement has been placed, as not to amage the concrete in any way. <br />In special cases, where <br />in obtaining a stable foundation and st <br />Concrete actually placed and approvei <br />(d) <br />Sand shall consist of <br />organic material. All particles must p <br />passing #200 sieve shall have a PI < 8 <br />2005.06 <br />Select material shall <br />free-flowing material like sand or mir <br />materials. Select material shall also in <br />chips shall have an average dimension <br />;med necessary by the Engineer, 2000 psi Concrete shall be used <br />be paid for at the unit contract price per cubic yard for 2000 psi <br />by the Engineer. <br />hard, durable, uncoated grains, free from lumps, clay, soil, and <br />a 3/8-inch sieve and less than 10% pass a#200 sieve. Material <br />LL < 30. <br />placed as designated on the plans. Select material shall consis[ of a <br />;d sand and gravel, free from lumps, large stones, clay and organic <br />:lude rock cuttings from a ditching machine provided that the largest <br />less than one (1) inch, and no d'unension grater than three (3) inches. <br />If approved by the Cit good, sound earth may be used as select material for backfill over the <br />pipe. Good, sound earth is defined gravel, sandy loam or loam, free from excessive clay. If, when the <br />material is damp and pressed into a fght ball into the hand and fingers are relaxed, the material crumbles <br />freely, the material will be considere as not having an excessive clay content. Good, sound earth will be <br />allowed as se]ect material only if sand or rock cuttings are not present on the project. Select material shall <br />not contain rocks with an average dimension larger than one (1) inch and no dimension greater than three <br />(3) inches. I <br />Select material shall first be cazefully placed on both sides of the pipe simultaneously in layers <br />of not more than four (4) inches in loose thickness, and these layers shall be fumly compacted by hand or <br />Item 2005-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.