Laserfiche WebLink
2014.05 DISINFECTION <br />Prior to disinfection, ea h valved section of the new pipeline shall be pressure [ested and <br />flushed with clean water from the City ystem to remove all appazent evidence of dust, soIl, and fine debris <br />that may have entered the line during c nstruction and testing. The water required to flush and disinfect the <br />lines, without unnecessary waste, shall paid for by the City without chazge to the Contractor. Should the <br />bacteriological test(s) fail, the Contract~r shall pay for all water used to re-flush and re-disinfect the line(s). <br />Chlorine shall be used <br />of chlorine shall be introduced to prov <br />pipeline. After a contact period of not <br />water until the residual chlorine contei <br />disinfected shall be opened and close <br />sample for each 1,000 feet of completc <br />1,000 feet, as designated by the City <br />The cost of furnishing <br />bacteriological samples shall be at the <br />until satisfactory test reports have bei <br />2014.06 PAYMENT <br />disinfect the pipeline by the following method: A sufficient amount <br />- a dosage of not less than fifty (50) parts per million throughout the <br />ss than twenty-four (24) hours, the system shall be flushed with clean <br />is not greater than 1.0 parts per million. All valves in the lines being <br />several tunes during the contract period. A minimum of one (1) <br />main shall be required, or at the next available sampling point beyond <br />te chlorine, labor, tools, equipment, tests of chlorine content and <br />pense of the Contractor. The pipeline shall not be placed in service <br />accomplished. <br />The pipeline, complete ' place, including embedment, will be measured for payment in linear <br />feet along the centerline of the pipe ac ually installed, including embedment and backFilling. Measurement <br />shall be through all fittings, specials, valves, etc., and no deduction in length shall be made for such <br />appurtenances. Installation of the pi eline will be paid for at the unit contract price per lineaz foot as <br />provided in the Proposal and Bid Sch dule. <br />Payment for connectio~s will be at the unit bid price for connections per each as provided in <br />the Proposal and Bid Schedule. <br />Payment of the unit c ntract price for [he items of work performed shall be the tota] <br />compensation for furnishing all labor, niaterial, tools, equipment and incidenta]s and performing all work that <br />is necessary for the installation and esting in accordance with the Plans and the provisions of these <br />specifications. j <br />Item 2014-4 <br />